版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、SH3503–J205整體框架式設(shè)備基礎(chǔ)整體框架式設(shè)備基礎(chǔ)允許偏差項(xiàng)目復(fù)測(cè)記錄允許偏差項(xiàng)目復(fù)測(cè)記錄RemeasurementRecdofFrameTypeEquipmentFoundationItemsofAllowableDeviationofFoundationfLumpEquipmentsItems工程名稱:ProjectDeionName:單元名稱:NameofBuildingUnitDeion:施工單位UnitingeofCo
2、nstructionUnit基礎(chǔ)名稱NameofFoundation圖號(hào)DrawingNoPlanSerialNumber復(fù)測(cè)日期DateofRemeasurement年(Y)月(M)日(D)各檢查點(diǎn)實(shí)際偏差(mm)ActualDeviationonthePointsInspected復(fù)測(cè)項(xiàng)目RemeasurementItems允許偏差(mm)AllowableDeviation12345678910基礎(chǔ)Foundation15獨(dú)立基礎(chǔ)
3、SeparateFoundation101軸線位移AxialDisplacementShiftingofAxis柱、梁ColumnbeamGirder85m及以下5mbelow8層間Interlaminar5m以上Above5m102垂直度Verticality全高TotalHeightH1000且≤30層高LayerHeight103標(biāo)高Elevation全高TotalHeight104截面尺寸SizeofCrossSection85
4、5表面平整度(用2m直尺檢查)SurfacePlaneflatnessMeasurement(inspectedby2mruler)8預(yù)埋件EmbeddedPartsPartsPreset5預(yù)埋地腳螺栓EmbeddedPresetFoundationBolts26預(yù)埋設(shè)施中心CenterofEmbeddedPresetFacilities預(yù)埋管EmbeddedPresetPipes37預(yù)留洞中心位移PreservedtHoleCente
5、rDisplacementLocation10注Note:H為結(jié)構(gòu)全高,檢查點(diǎn)位置見附圖Hrepresentsthetotalheightofthestructure.Refertotheattachedsketchfthelocationofinspectionpoints.復(fù)測(cè)結(jié)果確認(rèn)ConfirmationontheResultofRemeasurement:接收單位AcceptanceUnit建設(shè)監(jiān)理單位OwnerConstru
6、ctionSupervisyionUnit交出單位DeliveryUnit現(xiàn)場(chǎng)代表:SiteRepresentative:年(Y)月(M)日(D)專業(yè)工程師:DisciplineProfessionalEngineer:年(Y)月(M)日(D)技術(shù)負(fù)責(zé)人:TechnicalSupervisResponsiblePerson:質(zhì)量檢查員:QualityInspect:年(Y)月(M)日(D)SH3503–J205整體框架式設(shè)備基礎(chǔ)整體框架
7、式設(shè)備基礎(chǔ)允許偏差項(xiàng)目復(fù)測(cè)記錄允許偏差項(xiàng)目復(fù)測(cè)記錄RemeasurementRecdofFrameTypeEquipmentFoundationItemsofAllowableDeviationofFoundationfLumpEquipmentsItems工程名稱:ProjectDeionName:單元名稱:NameofBuildingUnitDeion:施工單位UnitingeofConstructionUnit基礎(chǔ)名稱Nameof
8、Foundation圖號(hào)DrawingNoPlanSerialNumber復(fù)測(cè)日期DateofRemeasurement年(Y)月(M)日(D)各檢查點(diǎn)實(shí)際偏差(mm)ActualDeviationonthePointsInspected復(fù)測(cè)項(xiàng)目RemeasurementItems允許偏差(mm)AllowableDeviation12345678910基礎(chǔ)Foundation15獨(dú)立基礎(chǔ)SeparateFoundation101軸線位
9、移AxialDisplacementShiftingofAxis柱、梁ColumnbeamGirder85m及以下5mbelow8層間Interlaminar5m以上Above5m102垂直度Verticality全高TotalHeightH1000且≤30層高LayerHeight103標(biāo)高Elevation全高TotalHeight104截面尺寸SizeofCrossSection855表面平整度(用2m直尺檢查)SurfacePl
10、aneflatnessMeasurement(inspectedby2mruler)8預(yù)埋件EmbeddedPartsPartsPreset5預(yù)埋地腳螺栓EmbeddedPresetFoundationBolts26預(yù)埋設(shè)施中心CenterofEmbeddedPresetFacilities預(yù)埋管EmbeddedPresetPipes37預(yù)留洞中心位移PreservedtHoleCenterDisplacementLocation10注
11、Note:H為結(jié)構(gòu)全高,檢查點(diǎn)位置見附圖Hrepresentsthetotalheightofthestructure.Refertotheattachedsketchfthelocationofinspectionpoints.復(fù)測(cè)結(jié)果確認(rèn)ConfirmationontheResultofRemeasurement:接收單位AcceptanceUnit建設(shè)監(jiān)理單位OwnerConstructionSupervisyionUnit交出單
溫馨提示
- 1. 本站所有資源如無(wú)特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 眾賞文庫(kù)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- j205整體框架式設(shè)備基礎(chǔ)
- j205整體框架式設(shè)備基礎(chǔ)
- 3503-j205
- 3503-J205.doc
- 3503-J205.doc
- 205總圖.DWG
- 205總圖.DWG
- 205總圖.DWG
- 205總圖.DWG
- 200-205.dwg
- 200-205.dwg
- CHT0502044-205.dwg
- CHT0502044-205.dwg
- CHT0502044-205.dwg
- CHT0502044-205.dwg
- CHT0502044-205.dwg
- CHT0502044-205.dwg
- CHT0502044-205.dwg
- gbzt205-2007gbzt205-2007密閉空間作業(yè)職業(yè)危害防護(hù)規(guī)范
- CHT0502044-205.dwg
評(píng)論
0/150
提交評(píng)論