版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)
文檔簡介
1、西安科技大學(xué)碩士學(xué)位論文厚煤層6.0m 采高液壓支架穩(wěn)定性研究姓名:朱世陽申請學(xué)位級別:碩士專業(yè):采礦工程指導(dǎo)教師:來興平2011-06Subject :Research on Hydraulic Support Stability of 6.0m Mining Height in Thick Coal Seam Specialty :Mining Engineering Name :Zhu Shiyang
2、 (Signature) Instructor :Lai Xingping (Signature) ABSTRACT Stability of large mining height hydraulic support is essential to safe production and high efficienc
3、y of working face. The article is sure that average consistent coefficient ( f ) of 5-2 coal seam in.15201 working face in Zhang jiamo colliery is 4.0, and basically need mechanics rigidity demands in 6.0m high height wo
4、rking face. By building up roof physical and mechanics model applied to confirm positions of key strata and estimated that working resistance of supports is 12000KN, and initial force is 7395KN.In the numerical simulatio
5、n searching for coal wall stability, the conclusion is that with advent of enlarging mining height and falling initial force wall caving is more severe. Also in the experiment of material simulation it is also demonstrat
6、ed that first weighting pace of main roof is 65m, average periodical weighting pace is 15m, and dynamic load factor is some 1.3. Those mentioned ensure weighting type of roof is II level obvious one and adopt dual pillar
7、 shield supports. The influence of abutment pressure is about 90m, especially concentrated zones at some 52m, being far away with working face. Rotation movements bring about a gigantic impulse resulting in deterioration
8、 of supports. According to pressure observation of the stope, actual periodical weighting pace is about 11.2m and dynamic load factor is 1.42.So both working resistance of supports and initial force are satisfied wi
9、th mining demands, and the type of hydraulic support is accurate.Stability of high height supports conforms Homes Using machines and comes true high efficiency and large products in the colliery. The article offers a va
10、lid experience for stability of high height supports in similar geo-condition, and also stability of high height supports in other condition can use for reference. Key words: Thick coal seam High mining height face S
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 眾賞文庫僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 大傾角厚煤層長壁大采高綜采支架穩(wěn)定性研究.pdf
- 大采高液壓支架穩(wěn)定性控制技術(shù)研究.pdf
- 竹林山煤礦5m厚煤層大采高采支架研究
- 泉店煤礦大傾角厚煤層大采高綜采頂板活動規(guī)律及支架穩(wěn)定性研究.pdf
- 厚煤層大采高液壓支架片幫控制技術(shù)研究.pdf
- 大采高采場圍巖控制及支架穩(wěn)定性研究.pdf
- 厚煤層工作面大采高液壓支架可靠性能研究.pdf
- 大采高煤層注水對煤壁穩(wěn)定性影響研究.pdf
- 復(fù)雜特厚煤層大采高工作面巷道穩(wěn)定性研究.pdf
- 大采高綜采面壓裂煤層煤壁穩(wěn)定性研究.pdf
- 采空區(qū)下特厚煤層大采高綜放工作面煤壁穩(wěn)定性及其控制研究.pdf
- 大傾角中厚煤層破碎頂板炮采轉(zhuǎn)綜采圍巖穩(wěn)定性研究.pdf
- 厚煤層殘煤復(fù)采長壁工作面煤巖穩(wěn)定性研究.pdf
- 大采高綜放采場覆巖結(jié)構(gòu)及支架穩(wěn)定性研究.pdf
- 急傾斜特厚煤層動壓巷道圍巖穩(wěn)定性研究.pdf
- 大傾角厚煤層俯-仰斜綜放采場圍巖穩(wěn)定性與控制技術(shù)研究.pdf
- 急斜特厚煤層綜放回采巷道穩(wěn)定性控制研究.pdf
- 多層緩傾斜薄--中厚礦床復(fù)雜采動采場結(jié)構(gòu)穩(wěn)定性研究.pdf
- 薄煤層螺旋鉆機采煤方法優(yōu)化及采場穩(wěn)定性研究.pdf
- 雙立柱液壓支架穩(wěn)定性分析.pdf
評論
0/150
提交評論