版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、英文原文Finite element analysis of three-way roadway junctions in longwall miningR.N. Singh, I. Porter, J. HematianFaculty of Engineering, UniÍersity of Wollongong, Northfields Avenue, Wollongong, NSW 2522, AustraliaAb
2、stract:This paper presents a three-dimensional finite element analysis of three-way roadway intersections in longwall mining, and assesses the stable/unstable behaviour of three-way intersections under a range of loading
3、 conditions. Loads were applied to the model by means of uniform stresses on the internal free faces. This method of loading the model from the inside helped to reduce its size and to eliminate the boundary effects. Stre
4、ss concentrations and displacement results on the mid-height of the pillars, roof and floor strata adjacent to the three-way intersections and cut-throughs were calculated.Based on this study, guidelines for designing th
5、e support system for three-way intersections are suggested. The results were validated by a case study of a three-way intersection in an underground coal mine in the southern coal fields of the Sydney Basin. Keywords:und
6、erground coal mining; gate roadway; intersections; stability; finite element method1. IntroductionA trend exists in Australia for installing high productivity longwall faces producing 3.0~4.0 milliontonne raw coal per an
7、num per face. The mainconcern for the success of the high-production longwallfaces is to achieve high rates of developmentand to maintain stability of access roadways andtheir intersections during the life span of the fa
8、ce.Intersections are formed when the pillars betweenthe two roadways are intersected by driving a crosscut. Roadway intersections in underground mines areparticularly susceptible to ground control problemsdue to inherent
9、ly wide roof spans used and the difficulty in installing roof supports promptly inhighly mechanised headings. Stresses induced duringintersection formation may result in high incidenceof roof and rib failures. Despite ma
10、ny investigationsinto the stability of gate roadways intersectionsadverse conditionssuch as high horizontal stress and unsteady state ofabutment pressure from moving longwall faces maycause instability of gate roadway in
11、tersections.For example in 1985; major strata control problems inthe main gate of no. 6 longwall panel at WestcliffColliery resulted in roof fall, which stopped coalproduction for a period of 6 weeks. Similarly, a rooffa
12、ilure incident at Pacific Colliery caused the longwallequipment to be buried resulting in Fig. 1. Plan and section of the finite element three-dimensional intersection modelTable 1 Rock properties assigned to
13、three-way intersection modelsRock type Thickness /m E /GPa νMedium grain sandstone 4.0 10.0 0.20Fine sandstone and mudstone 3.0 6.0 0.25Coarse sandstone and shale 2.0 3.0 0.20Top coal 1.0 3.5 0.3Coal 3.0 3.5 0.3Mudstone
14、1.0 8.0 0.25Coarse sandstone 4.0 12.5 0.2Medium grain sandstone 5.0 10.0 0.2model by means ofuniform pressures on the internal free faces. Thistechnique of applying load from the inside helped to reduce the size of the m
15、odel and to eliminate boundaryeffects. For all the loading configurations depictedin Table 2, a linear solution method was used.Table 2 Loading conditions applied to the three-dimensional modelLoading configurat
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 眾賞文庫(kù)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 采礦外文翻譯---長(zhǎng)壁采煤法回采巷道三向交叉點(diǎn)的三維有限元分析
- 采礦外文翻譯---長(zhǎng)壁采煤法回采巷道三向交叉點(diǎn)的三維有限元分析
- 采礦外文翻譯---長(zhǎng)壁采煤法回采巷道三向交叉點(diǎn)的三維有限元分析.docx
- 采礦外文翻譯---長(zhǎng)壁采煤法回采巷道三向交叉點(diǎn)的三維有限元分析.docx
- 采礦外文翻譯---長(zhǎng)壁采煤法回采巷道三向交叉點(diǎn)的三維有限元分析.docx
- 公伯峽大壩長(zhǎng)面板三維有限元分析.pdf
- 膝關(guān)節(jié)三維有限元模型的建立及前交叉韌帶生物力學(xué)三維有限元分析.pdf
- 水閘閘室接長(zhǎng)加固工程三維有限元分析.pdf
- 土釘支護(hù)三維有限元分析.pdf
- 道路外文翻譯----對(duì)柔性路面面層開裂的三維有限元分析
- 人膝關(guān)節(jié)三維有限元模型的建立及后交叉韌帶生物力學(xué)三維有限元分析.pdf
- 堤壩三維滲流場(chǎng)有限元分析.pdf
- 弧形鋼閘門三維有限元分析.pdf
- TiN涂層裂紋三維有限元分析.pdf
- 基樁反射波法的三維彈性有限元分析.pdf
- 壓電層合板的三維有限元分析.pdf
- 管殼式換熱器的三維有限元分析.pdf
- 填埋式柔性液體管道的三維有限元分析案例研究外文翻譯
- 填埋式柔性液體管道的三維有限元分析案例研究外文翻譯
- 填埋式柔性液體管道的三維有限元分析案例研究外文翻譯
評(píng)論
0/150
提交評(píng)論