1、1, and prepared according to 1.1, and thermal power engineering started debugging work provides 1.2, and thermal power power plant construction engineering started and the completed acceptance procedures 1.3, and thermal
2、 power unit started steam Blowpipe guide is 1.4, and thermal power engineering adjustment try shipped quality test and the evaluation standard 2, and #1 furnace started debugging organization measures and the related pro
3、vides 2.1, and organization Division: for guarantee wide up thermal power plant #1 furnace started debugging and the part steam machine system of smooth voted shipped, special established #1 furnace try shipped professio
4、nal group, members following: leader: Deputy Leader: supervision: crew: wide up try shipped personnel: wide up acceptance personnel: 2.2, and debugging, and try shipped content: boiler auxiliary machine Division debuggin
5、g electric dust of Division try turned and the debugging baking furnace Cook furnace boiler rushed tube, and blow sweep security door check 2.3, and operation provides and the Division: ① #1 furnace debugging, and try s
6、hipped by #1 furnace try shipped professional group requirements for, which single try turned and Division try shipped by xD three company led is responsible for. ② all moving operation operation must be in strict accord
7、ance with the prior authorization of the #1 boiler commissioning professional working group, and after starting, the test command-approved #1 furnace steps in the test programme, event of temporary changes be reported to
8、 headquarters approval. ③ commissioning, trial operation process is required for each project by Northwest electric power construction company ready “equipment installation records“, and fill in the test application form
9、, the a and b sides after passing the checks, fill in “partial commissioning checking before a visa“, reported head of the approval, carried out by the leader of unified command. About each action are made by the leader
10、 of a unified command, operation after the report to the team leader. Without the Director's consent shall not unilaterally make any startup operation, such as single operations, who is responsible for all security r
11、esponsibilities, with no ties to the other side. ⑤ all before the first turn of the motor, must be approved by both parties a common roll insulation measurement can be carried out properly. ⑥ After the end of each projec
12、t commissioning, fill in “partial acceptance visa trial shipments.“ As motor in rotating equipment commissioning test switch and mechanical part of their trial cannot continuously, this is considered two test projects sh
13、all be carried out according to the above four steps. 2.4, and attached work votes issued people, and license people, and work head list: party electrical first species, and second species work votes license people list:
14、 party engine work votes license people list: b electrical first species, and second species work votes issued people: b hot control professional issued people list: b hot control professional work head: b steam machine
15、 professional work votes issued people: b steam machine professional work votes head: b boiler professional work votes issued people: b boiler professional work votes head: attached: about personnel of contact phone part
16、y b Division 3, boiler auxiliary equipment debugging scenarios 3.1, send, induced draft fan try turned 3.1.1, try turning the former requirements of: 3.1.1.1, fan body and motor installed, based the second Grouting ends,
17、 and the concrete strength is up. 3.1.1.2, coupling the Centre has finished aligning standards, approved visa. 3.1.1.3, bearing clearance normal outer rims and bearing clearance is up to standard. 3.1.1.4, Benton ... Con
18、dition. 5.1.3, oven starts all range of comprehensive systems have been installed, grate, delivery, fan and slag machine to try to transfer a qualified acceptance and visas. 5.1.4, boiler pressure parts, body pipe all in
19、stalled, water pressure test and acceptance of visa. 5.1.5, thermal, electrical and instrument installation, single school qualified to simulate joint school qualified, ready to operate. 5.1.6, furnace wall masonry and
20、pipe insulation, corrosion protection all over, and acceptance. Boiler air and flue gas ducts clean, clutter-free, external oven site has been cleaned up. 5.1.7, ESP installation completion and acceptance of visa, water-
21、film dust collector completes the installation of approvedwater conditions, gray trench cover under installation conditions, must pass through the channel to temporary walkway, pool not installed around the railings to t
22、emporary fencing to prevent persons falling residue. 5.1.9, the drum and the expansion of the indicator on the header, should drum and set the box to check the local installation of temporary inflation indicator. 5.1.10,
23、 the wall built after the manhole, inspection door should be opened for natural drying. 5.1.11, choosing a furnace wall temperature measurement points according to the requirements and sampling points temperature measuri
24、ng points with the following location: 1.5mm-2.0mm above the combustion chamber side wall furnace non-Central Office, at the outlet of the furnace, and economizer exit flue, middle of back wall. 5.1.12 belongs all valve
25、tone, boiler system, and the name is correct. 5.1.13, boiler feed-water front open drum air doors, to empty the exhaust valve and traps the superheater header, injected into the boiler after treatment and softening wate
26、r to drum zero meter level, glass tube level gauge should be clear and correct. 5.1.14, acres of fine fuels such as wood, coal, fuel must not be mixed with iron class stuff. 5.1.15, according to prepared baking programme
27、, to technology to give積極分子考察寫實登記表 積極分子考察寫實登記表支部名稱: 支部名稱:積極分子姓名: 積極分子姓名:中共西安外事學院委員會 中共西安外事學院委員會年 月 日1, and prepared according to 1.1, and thermal power engineering started debugging work provides 1.2, and thermal
28、power power plant construction engineering started and the completed acceptance procedures 1.3, and thermal power unit started steam Blowpipe guide is 1.4, and thermal power engineering adjustment try shipped quality tes
29、t and the evaluation standard 2, and #1 furnace started debugging organization measures and the related provides 2.1, and organization Division: for guarantee wide up thermal power plant #1 furnace started debugging and
30、the part steam machine system of smooth voted shipped, special established #1 furnace try shipped professional group, members following: leader: Deputy Leader: supervision: crew: wide up try shipped personnel: wide up ac
31、ceptance personnel: 2.2, and debugging, and try shipped content: boiler auxiliary machine Division debugging electric dust of Division try turned and the debugging baking furnace Cook furnace boiler rushed tube, and blo
32、w sweep security door check 2.3, and operation provides and the Division: ① #1 furnace debugging, and try shipped by #1 furnace try shipped professional group requirements for, which single try turned and Division try sh
33、ipped by xD three company led is responsible for. ② all moving operation operation must be in strict accordance with the prior authorization of the #1 boiler commissioning professional working group, and after starting,
34、the test command-approved #1 furnace steps in the test programme, event of temporary changes be reported to headquarters approval. ③ commissioning, trial operation process is required for each project by Northwest electr
35、ic power construction company ready “equipment installation records“, and fill in the test application form, the a and b sides after passing the checks, fill in “partial commissioning checking before a visa“, reported he
36、ad of the approval, carried out by the leader of unified command. About each action are made by the leader of a unified command, operation after the report to the team leader. Without the Director's consent shall no
37、t unilaterally make any startup operation, such as single operations, who is responsible for all security responsibilities, with no ties to the other side. ⑤ all before the first turn of the motor, must be approved by bo
38、th parties a common roll insulation measurement can be carried out properly. ⑥ After the end of each project commissioning, fill in “partial acceptance visa trial shipments.“ As motor in rotating equipment commissioning
39、test switch and mechanical part of their trial cannot continuously, this is considered two test projects shall be carried out according to the above four steps. 2.4, and attached work votes issued people, and license peo
40、ple, and work head list: party electrical first species, and second species work votes license people list: party engine work votes license people list: b electrical first species, and second species work votes issued pe
41、ople: b hot control professional issued people list: b hot control professional work head: b steam machine professional work votes issued people: b steam machine professional work votes head: b boiler professional work
42、votes issued people: b boiler professional work votes head: attached: about personnel of contact phone party b Division 3, boiler auxiliary equipment debugging scenarios 3.1, send, induced draft fan try turned 3.1.1, try
43、 turning the former requirements of: 3.1.1.1, fan body and motor installed, based the second Grouting ends, and the concrete strength is up. 3.1.1.2, coupling the Centre has finished aligning standards, approved visa. 3.
44、1.1.3, bearing clearance normal outer rims and bearing clearance is up to standard. 3.1.1.4, Benton ... Condition. 5.1.3, oven starts all range of comprehensive systems have been installed, grate, delivery, fan and slag
45、machine to try to transfer a qualified acceptance and visas. 5.1.4, boiler pressure parts, body pipe all installed, water pressure test and acceptance of visa. 5.1.5, thermal, electrical and instrument installation, sin
46、gle school qualified to simulate joint school qualified, ready to operate. 5.1.6, furnace wall masonry and pipe insulation, corrosion protection all over, and acceptance. Boiler air and flue gas ducts clean, clutter-free
47、, external oven site has been cleaned up. 5.1.7, ESP installation completion and acceptance of visa, water-film dust collector completes the installation of approvedwater conditions, gray trench cover under installation
48、conditions, must pass through the channel to temporary walkway, pool not installed around the railings to temporary fencing to prevent persons falling residue. 5.1.9, the drum and the expansion of the indicator on the he
49、ader, should drum and set the box to check the local installation of temporary inflation indicator. 5.1.10, the wall built after the manhole, inspection door should be opened for natural drying. 5.1.11, choosing a furnac
50、e wall temperature measurement points according to the requirements and sampling points temperature measuring points with the following location: 1.5mm-2.0mm above the combustion chamber side wall furnace non-Central Off
51、ice, at the outlet of the furnace, and economizer exit flue, middle of back wall. 5.1.12 belongs all valve tone, boiler system, and the name is correct. 5.1.13, boiler feed-water front open drum air doors, to empty the e
52、xhaust valve and traps the superheater header, injected into the boiler after treatment and softening water to drum zero meter level, glass tube level gauge should be clear and correct. 5.1.14, acres of fine fuels such
53、as wood, coal, fuel must not be mixed with iron class stuff. 5.1.15, according to prepared baking programme, to technology to give家庭 主要成員 的職業(yè)和 政治面 貌父親:XXX 中共黨員 在 XXX 省 XXX 市 XXX 交通銀行工作 任辦公室主任。母親: XXX 在 XXX 省 XX 市 X
54、XX 區(qū) XXX 街 XXX 小區(qū)經(jīng)商 聯(lián)系密切的主 要社會關系的職業(yè) 及政治面貌叔:XXX 在 XXX 省 XX 市 XXX 縣 XXX 鄉(xiāng) XXX 村務農(nóng)姑、XXX 在 XXX 省 XX 市 XXX 縣 XXX 鄉(xiāng) XXX 村務農(nóng)舅、XXX 在 XXX 省 XX 市 XXX 縣 XXX 鄉(xiāng) XXX 村務農(nóng)姨、XXX 在 XXX 省 XX 市 XXX 縣 XXX 鄉(xiāng) XXX 村務農(nóng)。參加國何種訓練和 是否參加黨
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 眾賞文庫僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 積極分子考察寫實登記表模板
- 入黨積極分子培養(yǎng)考察登記表模板
- 入黨積極分子考察登記表
- 入黨積極分子考察登記表
- 入黨積極分子考察登記表
- 入黨積極分子考察登記表-范本
- 入黨積極分子培養(yǎng)考察登記表
- 入黨積極分子培養(yǎng)考察登記表填寫模板4
- 要求入黨的積極分子考察登記表
- 入黨積極分子考察登記表(填寫范例)
- 入黨積極分子培養(yǎng)考察登記表范文
- 入黨積極分子培養(yǎng)考察登記表(范例)
- 入黨積極分子培養(yǎng)考察登記表(樣表)
- 申請入黨積極分子培養(yǎng)考察登記表(模板)
- 申請入黨積極分子培養(yǎng)考察登記表(模板)
- 入黨積極分子考察登記表樣本(空表)
- 入黨積極分子登記表
- 入黨積極分子登記表
- 入黨積極分子培養(yǎng)考察登記表(2015新版)
- 大學生入黨積極分子考察登記表
評論
0/150
提交評論