1、<p><b> 浙江大學(xué)</b></p><p> 畢業(yè)設(shè)計(jì)(論文)外文翻譯</p><p> 畢業(yè)設(shè)計(jì)(論文)題目: </p><p> 外文題目:MINIMUM REQUIREMENTS FOR PRESSURE RELIEF VALVES </p>&l
2、t;p> 譯文題目: 泄壓閥的最低要求 </p><p> 系 (部): 機(jī) 械 系 </p><p> 專業(yè)班級(jí):過程裝備與控制工程0702 </p><p> 學(xué)生姓名: </p><p> 指導(dǎo)教
3、師: </p><p> 2010年 9月 27 日</p><p><b> 指導(dǎo)教師評(píng)閱意見</b></p><p> MINIMUM REQUIREMENTS FOR</p><p> PRESSURE RELIEF VALVES</p><
4、;p> UG-136(a) Mechanical Requirements</p><p> UG-136(a) (1) the design shall incorporate guiding arrangements necessary to ensure consistent operation and tightness.</p><p> UG-136(a) (2)
5、The spring shall be designed so that the full lift spring compression shall be no greater than 80% of the nominal solid defection. The permanent set of the spring (de?ned as the difference between the free</p><
6、;p> height and height measured 10 min after the spring has been compressed solid three additional times after presetting at room temperature) shall not exceed 0.5% of the free height.</p><p> UG-136(a)(
7、3) Each pressure relief valve on air, water over 140°F (60°C), or steam service shall have a substantial lifting device, which when activated will release the seating force on the disk when the pressure</p&g
8、t;<p> Relief valve is subjected to a pressure of at least 75% of the set pressure of the valve. Pilot operated pressure relief valves used on these services shall be provided with either a lifting device as desc
9、ribed above or means for connecting and applying pressure to the pilot adequate to verify that the moving parts critical to proper operation are free to move.</p><p> UG-136(a) (4) the seat of a pressure re
10、lief valve shall be fastened to the body of the pressure relief valve in such a way that there is no possibility of the seat lifting.</p><p> UG-136(a) (5) in the design of the body of the pressure relief v
11、alve, consideration shall be given to minimizing the effects of deposits.</p><p> UG-136(a) (6) Pressure relief valves having screwed inlet or outlet connections shall be provided with wrenching surfaces to
12、 allow for normal installation without damaging operating parts.</p><p> UG-136(a) (7) Means shall be provided in the design of all pressure relief valves for use under this Division for sealing all initial
13、 adjustments which can be made without disassembly of the valve. Seals shall be installed by the Manufacturer or Assembler at the time of initial adjustment. Seals shall be installed in a manner to prevent changing the a
14、djustment without breaking the seal. For pressure relief valves larger</p><p> Than NPS 1|2 (DN 15), the seal shall serve as a means of identifying the Manufacturer Or Assembler making the initial adjustmen
15、t.</p><p> UG-136(a) (8) If the design of a pressure relief valve is such that liquid can collect on the discharge side of the disk, except as permitted in (a)(9) below, the valve shall be equipped with a d
16、rain at the lowest point where liquid can collect (for installation, see UG-135).</p><p> UG-136(a) (9) Pressure relief valves that cannot be equipped with a drain as required in (a) (8) above because of de
17、sign or application may be used provided:</p><p> (a) The pressure relief valves are used only on gas service where there is neither liquid discharged from the valve nor liquid formed by condensation on the
18、 discharge side of the valve; and</p><p> (b) the pressure relief valves are provided with a cover or discharge piping per UG-135(f) to prevent liquid or other contaminant from entering the discharge side o
19、f the valve; and</p><p> (c) The pressure relief valve is marked FOR GAS SERVICE ONLY in addition to the requirements of UG-129.</p><p> UG-136(a) (10) for pressure relief valves of the diaphr
20、agm type, the space above the diaphragm shall be vented to prevent a buildup of pressure above the diaphragm. Pressure relief valves of the diaphragm type shall be designed so that failure or deterioration of the diaphra
21、gm material will not impair the ability of the valve to relieve at the rated capacity.</p><p> UG-136(b) Material Selections</p><p> UG-136(b) (1) Cast iron seats and disks are not permitted.&
22、lt;/p><p> UG-136(b) (2) Adjacent sliding surfaces such as guides and disks or disk holders shall both be of corrosion resistant material. Springs of corrosion resistant material or having a corrosion resistan
23、t coating are required. The seats and disks of pressure relief valves shall be of suitable material to resist corrosion by the ?uid to be contained.</p><p> NOTE: The degree of corrosion resistance, appropr
24、iate to the intended</p><p> service, shall be a matter of agreement between the manufacturer and</p><p> The purchaser.</p><p> UG-136(b)(3) Materials used in bodies and bonnets
25、 or yokes shall be listed in Section II and this Division.Carbon and low alloy steel bodies, bonnets, yokes and bolting (UG-20) subject to in-service temperatures colder than ?20°F(?30°C) shall meet the require
26、ments of UCS-66, unless exempted by the following.</p><p> (a) The coincident ratio de?ned in Fig. UCS-66.1 is 0.35 or less.</p><p> (b) The material(s) is exempted from impact testing per Fig
27、. UCS-66.</p><p> UG-136(b) (4) Materials used in nozzles, disks, and other parts contained within the external structure of the pressure relief valves shall be one of the following categories:</p>&
28、lt;p> (a) Listed in Section II;</p><p> (b) listed in ASTM speci?cations;</p><p> (c) Controlled by the Manufacturer of the pressure relief valve by a speci?cation ensuring control of chem
29、ical and physical properties and quality at least equivalent to ASTM standards.</p><p> UG-136(c) Inspection of Manufacturing and/or Assembly of Pressure Relief Valves</p><p> UG-136(c)(1) A M
30、anufacturer or Assembler shall demonstrate to the satisfaction of a representative from an ASME designated organization that his manufacturing, production, and testing facilities and quality control procedures will insur
31、e close agreement between the performance of random production samples and the performance of those valves submitted for Capacity Certi?cation.</p><p> UG-136(c) (2) Manufacturing, assembly, inspection, and
32、 test operations including capacity are subject to inspections at any time by a representative from an ASME designated organization.</p><p> UG-136(c) (3) A Manufacturer or Assembler may be granted permiss
33、ion to apply the UV Code Symbol to production pressure relief valves capacity certi?ed in accordance with UG-131 provided the following tests are</p><p> Successfully completed. This permission shall expire
34、 on the ?fth anniversary of the date it is initially granted. The permission may be extended for 5 year periods if the following tests are successfully repeated within the 6-month period before expiration.</p><
35、;p> (a) Two sample production pressure relief valves of a size and capacity within the capability of an ASME accepted laboratory shall be selected by a representative from an ASME designated organization.</p>
36、<p> (b) Operational and capacity tests shall be conducted in the presence of a representative from an ASME designated organization at an ASME accepted laboratory. The pressure relief valve Manufacturer or Assemble
37、r shall be noticed of the time of the test and may have representatives present to witness the test. Pressure relief valves having an adjustable blow down construction shall be adjusted by the Manufacturer or Assembler f
38、ollowing successful testing for operation but prior to ?ow testing so t</p><p> (c) Should any pressure relief valve fail to relieve at or above its certi?ed capacity or should it fail to meet performance r
39、equirements of this Division, the test shall be repeated at the rate of two replacement pressure relief valves, selected in accordance with (c)(3)(a) above, for</p><p> Each pressure relief valve that faile
40、d.</p><p> (d) Failure of any of the replacement pressure relief valves to meet the capacity or the performance requirements of this Division shall be cause for revocation within 60 days of the authorizatio
41、n to use the Code Symbol on that particular type of pressure relief valve. During this period, the Manufacturer or Assembler shall demonstrate the cause of such decadency and the action taken to guard against future occu
42、rrence, and the requirements of (c) (3) above shall apply.</p><p> UG-136(c) (4) Use of the Code Symbol Stamp by an Assembler indicates the use of original, unnoticed parts in strict accordance with the ins
43、tructions of the Manufacturer of the pressure relief valve.</p><p> (a) An assembler may transfer original and unnoticed pressure relief parts produced by the Manufacturer to other Assemblers provided the f
44、ollowing conditions are met:</p><p> (1) Both Assemblers have been granted permission to apply the V or UV Code Symbol to the speci?c valve type in which the parts are to be used;</p><p> (2)
45、The Quality Control System of the Assembler receiving the pressure relief valve parts shall de?ne the controls for the procurement and acceptance of those parts; and</p><p> (3) The pressure relief valve pa
46、rts are appropriately packaged, marked, or sealed by the Manufacturer to ensure that the parts are:</p><p> (a) Produced by the Manufacturer; and</p><p> (b) The parts are original and unnotic
47、ed. However, an Assembler may convert original ?nished parts by machining to another ?nished part for a speci?c application under the following conditions:</p><p> (1) Conversions shall be speci?ed by the M
48、anufacturer. Drawings and/or written instructions used for part conversion shall be obtained from the Manufacturer and shall include a drawing or description of the converted Part before and after machining.</p>&
49、lt;p> (2) The Assembler’s quality control system, as accepted by a representative from an ASME designated organization, must describe in detail the conversion of original parts, provisions for inspection and acceptan
50、ce, personnel training, and control of current Manufacturer’s</p><p> Drawings and/or written instructions.</p><p> (3) The Assembler must document each use of a converted part and that the pa
51、rt was used in strict accordance with the instructions of the Manufacturer.</p><p> (4) The Assembler must demonstrate to the Manufacturer the ability to perform each type of conversion. The Manufacturer sh
52、all document all authorizations granted to perform part conversions. The Manufacturer</p><p> And Assembler shall maintain a ?le of such authorizations.</p><p> (5) At least annually a review
53、shall be performed by the Manufacturer of an Assembler’s system and machining capabilities. The Manufacturer shall document the results of these reviews. A copy of this documentation shall be kept on ?le by the Assembler
54、. The review results shall be made available to a representative from an ASME designated organization.</p><p> UG-136(c) (5) In addition to the requirements of UG-129, the marking shall include the name of
55、the Manufacturer and the ?nalAssembler. The Code Symbol Stamp shall be that of the ?nal Assembler.</p><p> NOTE: Within the requirements of UG-136(c) and (d): A Manufacturer is de?ned as a person or organiz
56、ation who is completely responsible for design, material selection, capacity cortication, manufacture of all component parts, assembly, testing, sealing, and shipping of pressure relief valves credited under this Divisio
57、n. An Assembler is de?ned as a person or organization who purchases or receives from a Manufacturer or another Assembler the necessary component parts or pressure relief valves and </p><p> UG-136(d) Produc
58、tion Testing by Manufacturers and Assemblers</p><p> UG-136(d) (1) each pressure relief valve to which the Code Symbol Stamp is to be applied shall be subjected to the following tests by the Manufacturer or
59、 Assembler. A Manufacturer or Assembler shall have a documented program for the application, calibration, and maintenance</p><p> Of gages and instruments used during these tests.</p><p> UG-1
60、36(d)(2) The primary pressure parts of each pressure relief valve exceeding NPS 1 (DN 25) inlet size or 300 psi (2100 MPa) set pressure where the materials used are either cast or welded shall be tested at a pressure<
61、/p><p> Of at least 1.5 times the design pressure of the parts. These tests shall be conducted after all machining operations on the parts have been completed. There shall be no visible sign of leakage.</p&
62、gt;<p> UG-136(d) (3) the secondary pressure zone of each closed bonnet pressure relief valve exceeding NPS 1 (DN 25) inlet size when such pressure relief valves are designed for discharge to a closed system shal
63、l be tested</p><p> With air or other gas at a pressure of at least 30 psi (200 kPa). There shall be no visible sign of leakage.</p><p> UG-136(d) (4) each pressure relief valve shall be teste
64、d to demonstrate its popping or set pressure. Pressure relief valves marked for steam service or having special internal parts for steam service shall be tested with steam, except that pressure relief valves beyond the c
65、apability Of the production steam test facility either because of size or set pressure may be tested on air. Necessary corrections for differentials in popping pressure between steam and air shall be established by the M
66、anufa</p><p> UG-136(d) (5) after completion of the tests required by (d) (4) above, a seat tightness test shall be conducted. Unless otherwise designated by a Manufacturer’s published pressure relief valve
67、 speci?cation or another speci?cation agreed to by the user, the seat tightness test and acceptance criteria shall be in accordance with API 527.</p><p> UG-136(d) (6) Testing time on steam pressure relief
68、valves shall be sufficient, depending on size and design, to insure that test results are repeatable and representative of held performance.</p><p> UG-136(e) Design Requirements.</p><p> At t
69、he time of the submission of pressure relief valves for capacity cortication, or testing in accordance with (c) (3) above, the ASME designated organization has the authority to Review the design for conformity with the r
70、equirements of UG-136(a) and UG-136(b) and to reject or require medication of designs which do not conform, prior to capacity testing.</p><p> UG-136(f) Welding and Other Requirements.</p><p>
71、 All welding, brazing, heat treatment, and nondestructive examination used in the construction of bodies, bonnets, and yokes shall be performed in accordance with the Applicable requirements of this Division.</p>
72、<p> Selections from:ASME BOILER AND PRESSURE VESSEL CODE AN INTERNATIONAL CODE</p><p><b> 泄壓閥的最低要求</b></p><p> UG(a)136機(jī)械需求 UG 136(a)(1)設(shè)計(jì)應(yīng)納入指導(dǎo)和進(jìn)行必要安排以確保一致的行動(dòng) 和密封性。</p&
73、gt;<p> UG 136(a)(2)彈簧的設(shè)計(jì)應(yīng)使全面彈力壓縮不大于固體變形尺寸的80%彈簧的殘余變形(定義是:在室溫下預(yù)先設(shè)定后,彈簧的自由高度與常溫強(qiáng)壓處理后壓并三次再放開10min后測(cè)量的高度之差)不得超過自由高度的0.5% </p><p> UG 136(a)(3)每個(gè)泄壓閥,在空氣中,超過140華氏度(60℃)的熱水或蒸汽系統(tǒng)中都應(yīng)裝有可靠的提升裝置。當(dāng)安全閥將受到至少75%的閥
74、的設(shè)定壓力時(shí),提升機(jī)構(gòu)動(dòng)作,釋放閥座上的密封力。用于這些工況上的導(dǎo)閥應(yīng)有如上描述的提升機(jī)構(gòu)或有施加壓力的裝置,以驗(yàn)證該運(yùn)動(dòng)部件正常運(yùn)行可自由移動(dòng)。</p><p> UG 136(a)(4)泄壓閥座應(yīng)固定在瀉壓閥體上,在這樣一種方式下,沒有座移動(dòng)的可能性。</p><p> UG-136(a)(5)在泄壓閥體的設(shè)計(jì)中,應(yīng)考慮到盡量減少沉積的影響。</p><p>
75、; UG 136(a)(6)泄壓閥有螺紋連接的入口或出口,應(yīng)該具有扳手?jǐn)Q轉(zhuǎn)面,以便正常安裝而不損壞工作部件。</p><p> UG 136(a)(7)這種方法提供的設(shè)計(jì)可以運(yùn)用在所有泄壓閥上,密封所有初步調(diào)整而沒有閥的拆卸過程。密封應(yīng)由制造商或匯編在最初的調(diào)整中進(jìn)行。密封應(yīng)以一種好的方式安裝來阻止初調(diào)的改變而不破壞密封的調(diào)整。為了泄壓閥更實(shí)用該密封應(yīng)作為一種方式來識(shí)別制造商或匯編程序作出的初步調(diào)整。<
76、/p><p> UG 136(a)(8)除了下面(a)(9)允許的之外,如果泄壓閥的設(shè)計(jì)要使液體在閥瓣的泄放側(cè)匯集,則應(yīng)在匯集液面的最低處設(shè)置一個(gè)排放管(安裝,見UG-135)</p><p> UG 136(a)(9)泄壓閥因?yàn)樵O(shè)計(jì)或使用的原因不能按上面(a)(8)的要求設(shè)置排放口,可以使用,但:</p><p> (1)泄壓閥只應(yīng)用在氣體的傳送上在那里既沒有液
77、體排出也沒有液體的形成</p><p> ?。?)泄壓閥按UG-135(f)設(shè)計(jì)一個(gè)蓋子和排放管道以防止液體或其他污染物的排放進(jìn)入側(cè)閥門; (3)泄壓閥除了滿足UG-129要求外還應(yīng)標(biāo)志“僅用于氣體工況”字樣</p><p> UG 136(a)(10)對(duì)于隔膜式類型的泄壓閥 ,膈膜以上的空間應(yīng) 通氣,以防止上部隔膜壓力的產(chǎn)生。隔膜式的壓力調(diào)節(jié)閥應(yīng)該被設(shè)計(jì)成在隔膜材料失效或損壞時(shí),不
78、影響在額定排量下閥的泄放能力。</p><p> UG 136(b)材料的選擇 UG 136(b)(1)鑄鐵支座和閥瓣是不允許的UG的136(b)(2)相鄰滑動(dòng)面,如導(dǎo)向套,閥瓣或閥瓣夾持器,都應(yīng)使用腐蝕耐磨材料。彈簧應(yīng)由腐蝕耐磨材料或在彈簧上涂一層耐腐蝕涂料制成。該泄壓閥的支座和閥瓣盤,應(yīng)由能耐貯存介質(zhì)腐蝕的合成材料制成。</p><p> 注意:適合使用條件的耐腐蝕程度,應(yīng)由制
79、造商和買方之間協(xié)議事項(xiàng) UG 136(b)(3)閥體及閥蓋或閥軛應(yīng)是應(yīng)是列于第二卷或本冊(cè)的材料。操作溫度低于-20F(-29C)的碳鋼和低合金鋼。閥體、閥座、閥軛、和螺栓(UG-20)應(yīng)符合UCS-66的要求,下面的豁免除外:(a)按圖UCS-66.1定義的相應(yīng)比值小于等于0.35(b)按圖UCS-66材料不受沖擊試驗(yàn)。</p><p> UG的136(b)(4)用于接管,閥瓣及泄壓裝置的其他外部構(gòu)件材料
80、應(yīng)屬于下列類別之一:</p><p> (1)列于第二卷的材料; </p><p> ?。?)列于ASTM標(biāo)準(zhǔn)中的材料; (3)由泄壓閥出版商控制的材料,其化學(xué),物理和質(zhì)量規(guī)范的控制等效于ASTM標(biāo)準(zhǔn)。 UG的136(c)泄壓閥的制造和檢查</p><p> UG的136(c)(1)制造廠或裝配廠應(yīng)向ASME指定組織的代表表明其制造業(yè), 生產(chǎn),檢測(cè)設(shè)備和質(zhì)量
81、控制程序能保證產(chǎn)品抽樣的性能與為排量驗(yàn)證提交的那些閥的性能是一致的。</p><p> UG的136(c)(2)制造,裝配, 檢查和測(cè)試業(yè)務(wù),包括能力將在任何時(shí)間受到檢查由ASME指定機(jī)構(gòu)的代表。</p><p> UG的136(c)(3)如果下述試驗(yàn)全部合格,制造廠或裝配廠可以將UV規(guī)范標(biāo)志用于生產(chǎn)的按UG-131驗(yàn)證排量的泄壓閥。該授權(quán)在初始批準(zhǔn)5周年后的那一天失效,如果在失效前6
82、個(gè)月內(nèi)下列試驗(yàn)重復(fù)合格的可延長(zhǎng)5年有效期。</p><p> ?。╝)再生產(chǎn)的泄壓閥(尺寸和排量在ASME認(rèn)可的實(shí)驗(yàn)室能力范圍內(nèi))中,由ASME指定機(jī)構(gòu)的代表選擇兩個(gè)泄壓閥樣品</p><p> ?。╞)操作和排量測(cè)試應(yīng)在ASME認(rèn)可的實(shí)驗(yàn)室有ASME指定機(jī)構(gòu)代表在場(chǎng)進(jìn)行。應(yīng)通知泄壓閥制造廠或裝備廠試驗(yàn)的時(shí)間,制造廠或裝備廠可派人到現(xiàn)場(chǎng)觀察實(shí)驗(yàn)。具有瀉放可調(diào)結(jié)構(gòu)的泄壓閥應(yīng)有制造廠或裝配廠在
83、操作試驗(yàn)合格后但在流量試驗(yàn)之前進(jìn)行調(diào)整,使泄放壓力不超過調(diào)定壓力的7%或3PSI(20.6Kpa),取兩者中較大者,這一調(diào)解可在流量試驗(yàn)裝置上進(jìn)行。</p><p> ?。╟)如果任何泄壓閥在等于或高于其認(rèn)證的能力范圍內(nèi)不能緩解或者不能滿足其性能要求,則應(yīng)該取不合格泄壓閥的兩倍數(shù)量進(jìn)行復(fù)試按上面的(c)(3)(a)取樣。 (d)如果還不能符合其標(biāo)志排量或本冊(cè)的性能要求,則應(yīng)當(dāng)撤銷在60天的授權(quán)使用,在這一
84、時(shí)期,制造廠應(yīng)說明故障產(chǎn)生的原因和防范繼續(xù)發(fā)生所采取的措施,并按上面(c)(3)的要求進(jìn)行首次排量標(biāo)定。</p><p> UG 136(c)(4)裝配廠使用規(guī)范標(biāo)志鋼印表示所使用的零件時(shí)初次使用的是嚴(yán)格按照泄壓閥制造廠的說明書未經(jīng)改動(dòng)的部件</p><p> ?。╝)一家裝配廠可以將制造廠生產(chǎn)的原始的未經(jīng)改動(dòng)的泄壓閥零件轉(zhuǎn)移到另一家裝配廠,但要符合下列條件:</p>&l
85、t;p> ?。?)兩裝配廠均獲準(zhǔn)在使用該零件的特定閥型上使用V或UV規(guī)范標(biāo)志; (2)質(zhì)量控制系統(tǒng)的泄壓閥的部分應(yīng)該界定對(duì)于那些采購(gòu)和驗(yàn)收控制部分程序; (3)泄壓閥零件妥善包裝,標(biāo)識(shí),或由制造商蓋章,以確保零件是:</p><p> ?。╝)生產(chǎn)制造商生產(chǎn)(b)零件是最初的未經(jīng)改變的然而,裝配廠可將原有的加工成品轉(zhuǎn)到另一部分,為完成特定的應(yīng)用. 在下列情況下的具體應(yīng)用:</p><
86、;p> ?。?)轉(zhuǎn)換應(yīng)當(dāng)由生產(chǎn)廠家指定,圖紙和零件轉(zhuǎn)換使用的書面說明部分應(yīng)該被制造商接受或者應(yīng)該有前后加工轉(zhuǎn)化部分的圖紙和說明</p><p> ?。?)組裝的質(zhì)量控制體系, 由一個(gè)來自指定ASME 組織的代表接受,必須詳細(xì)說明原裝零件的改變程序,包括檢查和驗(yàn)收規(guī)定, 人員培訓(xùn),以及現(xiàn)行版本制造廠圖紙或書面說明的控制。 (3)裝配廠必須記錄每一個(gè)轉(zhuǎn)換部分的使用,而該部分是在按照制造商的指示嚴(yán)格的使用 (
87、4)裝配廠必須對(duì)制造商表現(xiàn)出有能力執(zhí)行每個(gè)類型的操作。制造廠應(yīng)以文件授權(quán)零件的改制。雙方應(yīng)保存該授權(quán)文件</p><p> ?。?)制造廠應(yīng)對(duì)裝配廠的體系和機(jī)加工能力做每年一次的評(píng)審。制造商須記錄這些審查的結(jié)果 這方面的一個(gè)文件的副本應(yīng)由裝配廠妥善保存,審查結(jié)果應(yīng)提供給一名ASME指定機(jī)構(gòu)代表查閱 UG 136(c)(5)除了UG 129的要求之外 銘牌標(biāo)記還應(yīng)包括制造廠和最終裝配廠的名稱。并使用最終裝
88、配廠的規(guī)范標(biāo)識(shí)鋼印。</p><p> 注意:在對(duì)UG 136的要求(c)和(d):制造商指的是一個(gè)人或組織,他對(duì)按照本冊(cè)要求的泄壓閥的設(shè)計(jì)、選材、排量驗(yàn)證及所有部件的裝配,測(cè)試,封裝,和航運(yùn)等完全負(fù)責(zé)。裝配廠指的是為一個(gè)人或一個(gè)組織他從制造廠那里購(gòu)買接收必要的泄壓閥零部件對(duì)按照本次要求的泄壓閥進(jìn)行組裝,調(diào)整,測(cè)試,密封,船運(yùn)。上述活動(dòng)場(chǎng)所及使用的裝置都不是制造廠所使用的,裝配廠在組織上可與制造廠無關(guān)或整個(gè)或部
89、分屬于制造廠。</p><p> UG 136(d)制造廠及裝配廠的生產(chǎn)試驗(yàn) UG 136(d)(1)每一個(gè)泄壓閥的鋼印,應(yīng)由制造廠做下面的測(cè)試。 一個(gè)制造廠應(yīng)該有書面的程序,規(guī)定其試驗(yàn)時(shí)所用的儀表的使用校驗(yàn)和維護(hù)。 UG 136(d)(2)對(duì)進(jìn)口尺寸超過NPS1(DN25)或調(diào)定壓力超過300psi(2070kpa)的每個(gè)泄壓閥的直接受壓件,其使用的材料是鑄造或焊接的,該部件應(yīng)在1.5倍
90、設(shè)計(jì)壓力下進(jìn)行試驗(yàn)。這些試驗(yàn)應(yīng)在部件所有機(jī)械加工操作完成后進(jìn)行。不得有明顯的跡象泄漏</p><p> UG 136(d)(3)每一個(gè)進(jìn)口尺寸超過NPS1(DN25)的密閉帽蓋,當(dāng)泄壓閥的流體向一密閉系統(tǒng)瀉放時(shí)應(yīng)在壓力不小于30psi(207kpa)的空氣或其他氣體對(duì)他的二次受壓區(qū)進(jìn)行試驗(yàn)。不得有滲漏明顯的跡象。</p><p> UG 136(d)(4)每個(gè)瀉壓閥應(yīng)通過測(cè)試,證明其彈
91、出或設(shè)定壓力。用于蒸汽或具有用于蒸汽的特殊內(nèi)件的泄壓閥應(yīng)用蒸汽做實(shí)驗(yàn)由于規(guī)格或調(diào)定壓力超過發(fā)生蒸汽實(shí)驗(yàn)裝置的能力時(shí)可用空氣進(jìn)行試驗(yàn)。制造廠應(yīng)確定蒸汽和空氣之間的爆鳴壓力差值的必要校正并將它用于空氣爆鳴點(diǎn)。標(biāo)明用于氣體或蒸汽泄壓閥可用空氣進(jìn)行試驗(yàn)。標(biāo)明用于液體或蒸汽的泄壓閥可用水或其他合適的液體進(jìn)行試驗(yàn),當(dāng)閥門對(duì)背壓疊加,溫度或蒸汽和空氣之間爆鳴壓差的工況做了校正。實(shí)際的試驗(yàn)壓力(冷差壓試驗(yàn)壓力)應(yīng)該按UG 129的要求標(biāo)志在閥門上。所用
92、的實(shí)驗(yàn)裝置及試驗(yàn)圓筒應(yīng)具有足夠的尺寸及容量,以保證泄壓閥在標(biāo)志調(diào)定壓力UG- 134(d)要求的允差內(nèi)動(dòng)作</p><p> UG 136(d)(5)在完成上面要求的測(cè)試后,應(yīng)進(jìn)行氣密性測(cè)試。 除非另有由制造商指定的設(shè)計(jì),泄壓閥規(guī)范或其他規(guī)范由用戶同意,氣密封性試驗(yàn)和驗(yàn)收標(biāo)準(zhǔn)應(yīng)符合API 527的規(guī)定。 UG的136(d)(6)對(duì)蒸汽壓力釋放閥門的測(cè)試時(shí)間應(yīng)足夠長(zhǎng), 為了保證測(cè)試結(jié)果的重復(fù)性和代表性
93、的性能。</p><p> UG 136(e)設(shè)計(jì)要求。</p><p> 在提交泄壓閥做排量驗(yàn)證或按UG136(c)(3)試驗(yàn)時(shí), ASME指定機(jī)構(gòu)有權(quán) 檢討符合設(shè)計(jì)的要求 看其是否符合UG - 136(1)和UG – 136的要求并在排量試驗(yàn)前有權(quán)拒絕或要求修改不符合要求的設(shè)計(jì)</p><p> UG的136(f)焊接和其他要求.</p>&
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 眾賞文庫僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 持壓泄壓閥-500x持壓泄壓閥
- 真空泄壓閥
- 排氣泄壓閥
- 先導(dǎo)式泄壓閥
- 水擊泄壓閥
- 安全泄壓閥-ax742x安全泄壓閥
- 液壓閥畢業(yè)設(shè)計(jì)外文翻譯
- danflo先導(dǎo)式泄壓閥
- 背壓泄壓閥說明書
- 隔膜式安全泄壓持壓閥-ax742x隔膜式安全泄壓持壓閥
- 畢業(yè)設(shè)計(jì)(論文)外文文獻(xiàn)翻譯要求
- 先導(dǎo)式安全泄壓閥
- 畢業(yè)設(shè)計(jì)--閥蓋的鑄造工藝設(shè)計(jì)及模擬(含外文翻譯)
- 石灰窯泄壓閥技術(shù)協(xié)議
- 淺談安全閥超壓泄放量的計(jì)算
- 先導(dǎo)式安全閥泄壓閥 上海博球閥門
- 畢業(yè)設(shè)計(jì)外文翻譯
- 拒絕專業(yè)術(shù)語!幾種渦輪泄壓閥簡(jiǎn)介
- 先導(dǎo)式水擊泄壓閥安裝維護(hù)手冊(cè)
- 網(wǎng)站畢業(yè)設(shè)計(jì)外文翻譯
評(píng)論
0/150
提交評(píng)論