2023年全國碩士研究生考試考研英語一試題真題(含答案詳解+作文范文)_第1頁
已閱讀1頁,還剩0頁未讀, 繼續(xù)免費閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)

文檔簡介

1、SH3503–J539高、低壓開關(guān)柜安裝檢查記錄HVLVswitchcabiinstallationinspectionrecd工程名稱Projectdeion:單元名稱Unitdeion:名稱Deion圖號DrawingNo柜號CabiNo臺數(shù)Quantity檢查內(nèi)容Inspectioncontent檢查結(jié)果Results1基礎(chǔ)型鋼已共檢合格,且有施工記錄Qualifiedfoundationprofilesteelhasbeensu

2、ppliedconstructionrecdsareavailable.盤頂部水平偏差Paneltophizontaldeviation柜面偏差Cabisurfacedeviation垂直度Verticality相鄰兩盤Twoneighbingpanels成列盤Arrangedinserial相鄰兩盤Twoneighbingpanels成列盤Arrangedinserial盤間接縫Jointclearancebetweenpanels2

3、柜安裝最大偏差(mm)Max.installationdeviation3外觀、漆層完好,安裝件、備件、操作專用工具、產(chǎn)品技術(shù)文件齊全Theouterappearanceshouldbegoodthepaintingshouldbeintact.Themountingpartssparepartsoperationalspecialtoolsproducttechnicaldocumentsshouldbecomplete.4柜內(nèi)電器安

4、裝牢固,型號、規(guī)格與設(shè)計相符Theelectricalpartsinsidethecabiaresecurelyinstalled.Thetypesspecificationsshouldbeincompliancewiththedesign.5柜內(nèi)母線規(guī)格、材質(zhì)、對地和相間距離符合設(shè)計和規(guī)范要求Thespecificationsmaterialofthebusinsidethecabidistancetothegroundphases

5、shouldbeincompliancewiththedesignrelevantcode.6母線安裝、連接符合規(guī)范要求,連接螺栓應(yīng)用力矩扳手緊固Theinstallationconnectionofthebusshouldcomplywiththerequirementsofrelevantcode.Theconnectingboltsshouldbetightenedbymeansofatquespanner.7柜體、抽屜、小車接地

6、齊全,牢固可靠Thecabibodydrawertrolleyshouldbeallgroundedinasecurereliablemanner.8抽屜、小車推拉靈活,同型號能互換,主觸頭及二次回路連接插件接觸良好Thedrawertrolleyshouldbeabletomovefreely.Sametypeofdrawerstrolleysshouldbeinterchangeable.Themaincontactshouldbe

7、ingoodcontactwiththeconnectioncardofthesecondarycircuit.9防止電氣誤操作的“五防”裝置齊全,動作靈活可靠The“Fiveprevention”devicesagainstwrongelectricaloperationshouldbeallavailablecanactivatereliably.10校驗一、二次回路,接線準確,連接可靠,標志齊全Calibratetheprimar

8、ysecondarycircuits.Thewiringshouldbecrectconnectionreliableidentificationmarkscomplete.11繼電器試驗記錄Takerelaytestrecd.12電氣測量儀表檢驗記錄Takeelectricinstrumentsinspectionrecd.13電氣設(shè)備交接試驗記錄Takeelectricalequipmentturnovertestrecd.14電氣

9、模擬試驗Conductelectricalsimulationtest15受電前檢查,柜內(nèi)清掃、擦拭干凈Cleantheinsideofthecabibefeenergization.16測量絕緣電阻Measuretheinsulationresistance.17相序檢查及核相Checkphasesequenceverifyphases.受電日期Energizationdate:年Y月M日D時H分M結(jié)論Conclusion備注Rema

10、rks建設(shè)監(jiān)理單位OwnerSupervisionUnit施工單位ConstructionUnit專業(yè)工程師DisciplineEngineer:年(Y)月(M)日(D)技術(shù)負責(zé)人TechnicalResponsiblePerson:質(zhì)量檢查員QualityInspect:班(組)長GroupLeader:年(Y)月(M)日(D)SH3503–J539高、低壓開關(guān)柜安裝檢查記錄HVLVswitchcabiinstallationinsp

11、ectionrecd工程名稱Projectdeion:單元名稱Unitdeion:名稱Deion圖號DrawingNo柜號CabiNo臺數(shù)Quantity檢查內(nèi)容Inspectioncontent檢查結(jié)果Results1基礎(chǔ)型鋼已共檢合格,且有施工記錄Qualifiedfoundationprofilesteelhasbeensuppliedconstructionrecdsareavailable.盤頂部水平偏差Paneltophiz

12、ontaldeviation柜面偏差Cabisurfacedeviation垂直度Verticality相鄰兩盤Twoneighbingpanels成列盤Arrangedinserial相鄰兩盤Twoneighbingpanels成列盤Arrangedinserial盤間接縫Jointclearancebetweenpanels2柜安裝最大偏差(mm)Max.installationdeviation3外觀、漆層完好,安裝件、備件、操作

13、專用工具、產(chǎn)品技術(shù)文件齊全Theouterappearanceshouldbegoodthepaintingshouldbeintact.Themountingpartssparepartsoperationalspecialtoolsproducttechnicaldocumentsshouldbecomplete.4柜內(nèi)電器安裝牢固,型號、規(guī)格與設(shè)計相符Theelectricalpartsinsidethecabiaresecure

14、lyinstalled.Thetypesspecificationsshouldbeincompliancewiththedesign.5柜內(nèi)母線規(guī)格、材質(zhì)、對地和相間距離符合設(shè)計和規(guī)范要求Thespecificationsmaterialofthebusinsidethecabidistancetothegroundphasesshouldbeincompliancewiththedesignrelevantcode.6母線安裝、連接

15、符合規(guī)范要求,連接螺栓應(yīng)用力矩扳手緊固Theinstallationconnectionofthebusshouldcomplywiththerequirementsofrelevantcode.Theconnectingboltsshouldbetightenedbymeansofatquespanner.7柜體、抽屜、小車接地齊全,牢固可靠Thecabibodydrawertrolleyshouldbeallgroundedinas

16、ecurereliablemanner.8抽屜、小車推拉靈活,同型號能互換,主觸頭及二次回路連接插件接觸良好Thedrawertrolleyshouldbeabletomovefreely.Sametypeofdrawerstrolleysshouldbeinterchangeable.Themaincontactshouldbeingoodcontactwiththeconnectioncardofthesecondarycircui

17、t.9防止電氣誤操作的“五防”裝置齊全,動作靈活可靠The“Fiveprevention”devicesagainstwrongelectricaloperationshouldbeallavailablecanactivatereliably.10校驗一、二次回路,接線準確,連接可靠,標志齊全Calibratetheprimarysecondarycircuits.Thewiringshouldbecrectconnectionrel

18、iableidentificationmarkscomplete.11繼電器試驗記錄Takerelaytestrecd.12電氣測量儀表檢驗記錄Takeelectricinstrumentsinspectionrecd.13電氣設(shè)備交接試驗記錄Takeelectricalequipmentturnovertestrecd.14電氣模擬試驗Conductelectricalsimulationtest15受電前檢查,柜內(nèi)清掃、擦拭干凈Cl

19、eantheinsideofthecabibefeenergization.16測量絕緣電阻Measuretheinsulationresistance.17相序檢查及核相Checkphasesequenceverifyphases.受電日期Energizationdate:年Y月M日D時H分M結(jié)論Conclusion備注Remarks建設(shè)監(jiān)理單位OwnerSupervisionUnit施工單位ConstructionUnit專業(yè)工程師

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 眾賞文庫僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論