版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
1、,PC200-8,New Product Service Training,Contents,Page1. Overall Layout32.Engine4, 53.Changes done around Engine6, 74.Cooling8, 95.Electrical equipment on Machine Body10 - 126.Hydraulic Equipment and Pipe
2、related Changes13 - 227.Revolving Frame238.Operator Cab and inside Cab24 - 309.Machine Cab31 - 3510.Swing Machinery36, 3711.Travel Machinery3812.Undercarriage-related Changes3913.Work Equipment4014
3、.Attachment Options41 - 4515.Engine and Pump Matching Control46, 4716.Comparison of Specifications (PC200-8)4817.Sales Drawing and Operation Range Drawing (PC200-8)49, 5018.Information on Compatibility of re
4、spective Equipment51 - 53,Overall Layout,,,,,,,,,,,,,,,,,,,,,,,,,,Battery,Swivel joint,Swing motor/swing machinery,Pilot filter (for ATT specification-based machines alone),Main pump,Engine oil filter,Fuel pre-filter(
5、with water separator),Engine(Tier 3 supported),Fuel main filter,Air cleaner,Washer tank,Reserve tank,Tool box,Grease gun holder,Control valve,Multi pattern selector valve(OPT),Radiator,Oil cooler,After cooler,Fuel cool
6、er,Condenser of air conditioner(Receiver dryer contained),Low-pressure accumulator(For ATT specification-based machines alone),Single action/double action selector valve(For ATT specification-based machines alone),Fue
7、l tank,Hydraulic oil tank,,CAB,,Extended return filter(For ATT specification-based machines alone),Engine,,PC200-8,PC200-7,Change of fan - pulley ratioPC200: 0.87? 0.96PC220: 0.96? 1.03,Major Changes done on Engine,,
8、,,,,,Fuel filter 25m to be replaced at every 500h,Engine controller,Governor motor,Engine oil filter,Fuel main filter 2m to be replaced at every 1000h,Fuel pre-filter 10m to be replaced at every 500h Equipped wit
9、h built-in water separator Equipped with priming pump (manual),Water separator,,,,,,,Engine oil filter,,,Fuel spill hose To be abolished from Model 8 (To be returned to the return pipe inside the engine),,Noise reduc
10、tion,,Engine,Major Changes done on Engine,,,,,,Priming pump (manual),Pre-filter (10?),Water separator,(Inspection before starting operation is available from the monitor panel),Anti-noise muffler,Fuel pre-filter,Muffler
11、 cover,,Provided to reduce engine exhaust noise,Employment of two internal pipes,Glass wool,For water separatorWater-in-fuel sensor,Changes done around Engine,,PC200-8,PC200-7,Change in stopper structure,Change in lock,
12、,,,,Change in engine mount structure,The same structure as PC400-7,Changes done around Engine,PC200-8,PC200-7,Intake port,Change in air cleaner and intake port,,Change in the size (PC200-8 alone): 11 inches ? 10 inches.
13、PC220-8 is 11 inches.,,,,,Cooling,PC200-8,PC200-7,Change in Cooling,,Face-to-face type,Side-by-side type,Radiator,Oil cooler,After cooler,Condenser of air conditioner,Fuel cooler,Condenser of air conditioner,After cooler
14、,Oil cooler,Radiator,,,,,,,,,,Cooling,PC200-8,PC200-7,Change in Cooling,Radiator,Oil cooler,After cooler,Condenser of air conditioner,Fuel cooler,Radiator,Oil cooler,After cooler,Condenser of air conditioner,Oil cooler i
15、s 3-piece assembly,,,Pilot check valve:To be contained in the control valve from Model 8,,Receiver dryer has a combined type structure(The same structure as PC228US-3),,,Electrical equipment on Machine Body,,Change in
16、harness,Change in clip,,Colgate clip (resin),,,,,,,,,,,,,,,,,,,,,,Inside the CAB,Outside the CAB,Divided by connectors,,,To sensors on the machine body,To controller and monitor,,,,,,Inside the CAB,Outside the CAB,All co
17、nnectors were abolished and replaced with harnesses,,,To sensors on the machine body,To controller and monitor,,PC200-8,PC200-7,PC200-8,PC200-7,Electrical equipment on Machine Body,Change in travel alarm,,Reduction in si
18、ze of travel alarm,PC200 107dB PC220 107dB,Improved safety of power supply circuit,,Employment of independent power supply circuit (Single line),Heat-resistant conduit and tape are used,Alternator,
19、Alternator,Signal and power supply circuit (united),Ordinary conduit and tape are used,,,,,Model 8,PC200 97dB PC220 107dB,Model 8,Model 7,Model 7,Electrical equipment on Machine Body,Pressure sen
20、sor,Change in high-pressure sensor,Six low-pressure sensors have been employed for PPC circuit ? Current: Pressure switch,Change in connector AMP EJ II (3-pole) ? DT (3 pole),,,Connector: AMP EJ II (3-pole),Hydraulic
21、 Equipment and Pipe related Changes,Overview of Hydraulic Equipment and Pipe related Changes,PPC circuit: Pressure sensor ? Pressure switch,New junction valveEPC valve has been employed for the control of converging
22、and dividing of main and LS (currently the control is done by ON or OFF of the solenoid valve),Employment of control valve-contained cooler check valve,,,,,,,,Hydraulic Equipment and Pipe related Changes,Overview of Hyd
23、raulic Equipment and Pipe related Changes,Employment of the arm quick return valve,Changes in the control valve mounting method (employment of bottom tightening),Changes in the discharge port (drawn out sideways),An EPC
24、valve for PC control has been added to support independent control of F and R pumps,,,,,The arm dump side safety valve has been replaced with the centralized safety valve,,Reduction of hydraulic oil tank capacity,,Change
25、s in the main relief valve structure,,Hydraulic Equipment and Pipe related Changes,Changes in Control Valve Mounting Method,PC200-8,PC200-7,,Tightening in sideways,Tightening at bottom,,,Hydraulic Equipment and Pipe rela
26、ted Changes,Employment of Control Valve-contained Cooler Check Valve,PC200-8,PC200-7,,Cooler check valve,Cooler check valve,,,,,,,,,,,,,,Return,Return,To oil cooler,To tank,From oil cooler,,,,,,Hydraulic Equipment and Pi
27、pe related Changes,Changes in Main Relief Valve Structure,PC200-8,PC200-7,,The same structure as PC220-7 to PC400-7 has been employed,Hydraulic Equipment and Pipe related Changes,Employment of Arm Quick Return Valve,A-A,
28、B-B,,,,,,,From cylinder,To tank,To control valve,From cylinder,Pilot signal for arm dump (From internal passage of control valve),To tank,,,Hydraulic Equipment and Pipe related Changes,Arm valve,Boom valve,,,,,Centralize
29、d safety valve,To arm cylinder head,To boom cylinder bottom,,Pump circuit,,,Pump circuit,Tank circuit,,,,Replacement of Arm Dump Side Safety Valve with Centralized Safety Valve,Hydraulic Equipment and Pipe related Change
30、s,Improvement in Oil Pressure Loss through Employment of new Converging and Dividing Control,When flows from pumps are converged,When pumps are divided,Converged,Divided,150 kg/cm2,150 kg/cm2,150 kg/cm2,50 kg/cm2,150 kg/
31、cm2,150 kg/cm2,50 kg/cm2,50 kg/cm2,100 L/min,100 L/min,100 L/min,100 L/min,,Press loss100 kg/cm2 ? 100 L/min,Division loss,Pumps R and F are independently controlled,,,Converging and dividing of the pumps are executed
32、corresponding to the pump pressures and work patterns.,,,,,,,,,,,,,,,,,,,,,,ON/OFF solenoid valve for converging and dividing,,,,,,,,,,,Controller,,,,,,,,,,F control valve,R control valve,PumpF,PumpR,,,,,,,,Pressure
33、SW,,,,,,,,,,,,LS line,Main line,PC valve,PC_EPC,LS_EPC,LS valve,LS valve,PC valve,,PC200-7,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Controller,,,,,,,,,,,,F control valve,R control valve,PumpF,PumpR,,,,,,,,,,Converging and dividin
34、g valve,,,,,,,,,,,,,,,,LS line,Main line,LS valve,PC valve,LS valve,PC valve,Converging/dividing LS selector proportional solenoid,Converging/dividing main selector proportional solenoid,PC_EPC_F,LS_EPC,PC_EPC_R,Pres
35、sure sensor,,PC200-8,,Improvement in Oil Pressure Loss through Employment of new Converging and Dividing Control,,,,,,PumpPressure sensor,,,PumpPressure sensor,,,Hydraulic Equipment and Pipe related Changes,Convergi
36、ng and dividing valve,Hydraulic Equipment and Pipe related Changes,Changes conducted on main Pump,Changes conducted on pump discharge port,PC-EPC valve for R pump,PC-EPC valve for F pump,LS-EPC valve,,,,F pump discharge
37、 pressure pick-up port,R pump discharge pressure pick-up port,F pump discharge pressure pick-up port,,,R pump LS pressure pick-up port,,,,1) Improvement of pump efficiency,2) Employment of two EPC valves,PC200-8,PC200-
38、7,Revolving frame,Enlargement of Opening below Engine,PC200-8,PC200-7,,Supply pump,Engine controller,Injection pump,,,,,,,,,,,,,562.5,604,500,300,,,Operator Cab and inside Cab,Employment of Operator Protective Cab Struct
39、ure in Tipping Over,Operator Cab and inside Cab,Employment of Operator Protective Cab Structure in Tipping Over,,,,Revolving frame,,M30 bolt tightening torque: 245 to 309 Nm,M12 bolt tightening torque: 98 to 123 Nm,,,Det
40、ails of stopper,Cab,,,,Operator Cab and inside Cab,Cab Equipment,,,,,,,,,Grade up of monitor panel,One-touch storage of the front window's lower glass,Armrest,A large ashtray is newly prepared,Operator Cab and inside
41、 Cab,?,?,?,?,?,?,⑦,?,?,?,Change of relay,,Electrical Equipment in rear side of Cab,Operator Cab and inside Cab,Pump Controller,PC200-8,,PC200-7,New type connector,Locked state,Freed state,? Press the pawl,? Raise the lev
42、er to remove,,,,,,,Operator Cab and inside Cab,Monitor light switch,RH console,Position for nighttime,Light off position,Position for daytime,,,,Light switch(3-position type),,Operator Cab and inside Cab,Monitor Panel,F
43、unctional integration,PC200-8,PC200-7,Monitor panel,Monitor panel,KOMTRAX communication terminal,KOMTRAX controller,Panel for air conditioner (Controller),Controller for air conditioner,,CAN,CAN,,,Machine Cab,Overview o
44、f Changes conducted on Machine Cab,PC200-8,PC200-7,,?,?,?,?,?,Machine Cab,,,,,,,,,,,,,,,Protrusion type slip-proof,PC200-7 (Existing machine),PC200-8,Abrasive paper type,New Employment of Protrusion Type Slip-proof,Machi
45、ne Cab,PC200-8,Field of Vision complied with New ISO Standard,PC200-7,,Size: W200 ? H280Curvature: 1000,Size: ?250Curvature: 400,Size: W130 ? H280Curvature: 620,Size: ?250Curvature: 400,Size: W200 ? H280Curvature: 1
46、000,Size: W135 ? H285Curvature: 620,,,Machine Cab,Employment of Press Type Frame,Sounds of wind suctioned from the fan is absorbed in the fan,PC200-7,,,,Welding,Pressed into a single body,,PC200-8,PC200-8,Acoustic Sound
47、 absorption is done here,Machine Cab,,,Employment of Gas Dumper for Opening and Closing of Engine Hood,PC200-8,,PC200-7,,Allows easy opening with a single hand,Torsion bar,Gas dumper,Swing Machinery,Remote Draining of Sw
48、ing Machinery,Drain plug,,Remote draining of swing machinery has been made easier,,PC200-8,PC200-7,Swing Machinery,Swing motor,Shape of the motor case has been modified,PC200-8,PC200-7,,Reverse prevention valve,,,Travel
49、Machinery,Travel motor,PC200-8,PC200-7,,,,,?,?,?,Undercarriage-related Changes,Travel Motor,PC200-8,PC200-7,Changes in upper track roller holding approach,Step of track frameEmployment of additional improved riding ste
50、p for wide shoe (for shoes 800m or above only),,,,Work Equipment,Bushing at Arm Tip,Current bushing at the arm tip has been replaced with CRHF bushing excelling in seizure resistance and wear resistance.,? Bucket side en
51、d face: IQT ? Sprayed with WC (tungsten),? Bushing end face: CRHF ? Sprayed with WC (tungsten),,CRHF,?,?,,?,,? CRHF,Attachment Options,ATT Specification-based Machines (Machines equipped with attachment pipe),PC200
52、-8,PC200-7,,Change of the stopper valve position,,1 -12UN,516,,Size of screw situated at the arm tip pipe,,Single action (for breaker), 1-pump flow rate and low pressure safety valve,Double action, 2-pump flow rate
53、and high pressure safety valve(The same operation as that for work the equipment allows reducing oil volume to ATT),Selection of breaker mode,Selection of attachment mode,A filter (6? ) has been added to the pilot circu
54、it,,Attachment Options,ATT specification-based machines (Machines equipped with attachment pipe),PPC valve for attachment Built-in EPC valve for flow rate adjustment,PPC valve for attachment,EPC valve,,,Attachment Opti
55、ons,Arm Crane Specification-based Machines,Large 7-inch LCD enables easier viewing of necessary information,Attachment Options,+10 specification that displays greater force in quarry field has been introduced.,+10 Specif
56、ication-based Machines (PC210/LC-8),Increase in mass of counterweight+600 kg,Reinforcement of revolving frameUnder cover (t1.6 ? t9),Reinforcement of revolving frame(Equivalent to PC220),Deck guard,Reinforced boom (
57、Plate thickness has been increased compared with the standard type),Reinforced arm(Plate thickness has been increased compared with the standard type),Rock Bucket(with side shroud),,,,,,,,Attachment Options,Demolition
58、Specification-based Machines (PC210/LC-8),The demolition specification has been prepared to enable installation of the hydraulic pipe as standard equipment and also to enable furnishing the attachments such as the breake
59、r and crasher.,Demolition arm(Plate thickness has been increased compared with the standard type),Larger diameter bucket cylinder,,Cab skylight is fixed to see-throughOpen-close head guard(Skylight wiper and washer a
60、re options),Track frame under cover (t9),Counterweight with increased mass+600 kg(with round suspender hook),Under cover for reinforcement of revolving frame(t1.6 ? t9),Reinforcement of revolving frame(Equivalent to
61、PC220),Deck guard,Reinforced boom(Boom for +10),Reinforced link,Reinforced bucket,Attachment pipe,Cab front half guard(Open-close front Full guard is an option),,,,,,,,,,,,,Work equipment (with round suspender hook
62、),,Round suspender hook is built in the counterweight,Engine/Pump Matching Control,Control of Model 7,Matching point in A mode,Then engine installed on Model 7 is controlled with the mechanical governor. Only one curb is
63、 used on the engine.(When the fuel dial is full in A mode),Engine/Pump Matching Control,Control of Model 8,Common rail type engine has been newly installed on Model 8.Control of the engine is done with the engine contr
64、oller. It is capable of controlling fuel injection.,This difference in horsepower represents the improvement done in pressure loss,Thus, two engine curbs are used on this Model 8.Matching points are selectively used dep
65、ending the operation pattern.(When the fuel dial is full in P mode),Matching point 1 in P mode (P1)When the operation pattern requires full horsepower,Constant horsepower line,Matching point 2 in P mode (P2)When the o
66、peration pattern with and improved pressure loss is used,Oil pressure loss has been improved as described in the section of the hydraulic equipment.When given the same work, you can reduce the horsepower by the improvem
67、ent done on the oil pressure loss.,,Improvement in fuel costs,Comparison of Specification (PC200-8),Machine model,Komatsu,Hitachi,Shinko,Sanyo,Item,Operating weight,Unit,Bucket capacity new JIS (old JIS),Engine,Engine na
68、me,Rated output,Set oil pressure,During work,During travel (one-touch),Travel speed,Maximum draw bar force,Limit in uphill travel,Ground pressure,Swing speed,Maximum digging force,Bucket Normally
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 眾賞文庫僅提供信息存儲空間,僅對用戶上傳內容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 小松挖掘機產(chǎn)品在華分銷渠道策略研究.pdf
- 挖掘機小松pc220-6常見故障排除與分析
- 挖掘機小松pc220-6常見故障排除與分析
- 《小松液壓挖掘機PC20R-8、PC27R-8操作保養(yǎng)手冊》英譯漢實踐報告.pdf
- 基于PC02-1小松液壓挖掘機的虛擬樣機仿真分析研究.pdf
- 挖掘機培訓實用教材
- 挖掘機培訓實用教材
- [學習]兒童游樂挖掘機兒童挖掘機游樂挖掘機
- 挖掘機基礎知識培訓
- wy-200型挖掘機液壓系統(tǒng)設計【8張cad圖紙】【優(yōu)秀】
- wy-200型挖掘機液壓系統(tǒng)設計【8張cad圖紙】【優(yōu)秀】
- 小挖掘機租賃合同小時租
- TH200--8挖掘機液壓系統(tǒng)污染度控制方法研究.pdf
- 小挖掘機租賃合同小時租
- wy200型挖掘機液壓系統(tǒng)設計
- 挖掘機
- 挖掘機
- 挖掘機
- 挖掘機
- 挖掘機產(chǎn)品外觀設計分析
評論
0/150
提交評論