2023年全國碩士研究生考試考研英語一試題真題(含答案詳解+作文范文)_第1頁
已閱讀1頁,還剩92頁未讀, 繼續(xù)免費閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)

文檔簡介

1、河北工程大學(xué)碩士學(xué)位論文1.0m極近距離煤層同采合理錯距和開采技術(shù)研究姓名:劉超申請學(xué)位級別:碩士專業(yè):采礦工程指導(dǎo)教師:楊本生2011-04Abstract IIAbstract Combining with characteristics of Daqing and Xiajia 1.0m very contiguous seams combined mining and based on in-situ investigation

2、 and analysis of practical engineering, comprehensive research methods combining theoretical analysis, three-dimensional numerical simulation and in-situ mine pressure measurement were carried out to investigate the reas

3、onable alternate distance, regularity of the overburden strata, technology of combined mining, complex stress field and displacement field, strata-pressure behavior. Firstly, through the analysis of the overburden strat

4、a movement, deformation failure process, collapse and the interactives space-time relation in the 1.0m very contiguous seams combined mining, the overburden strata structure forms of Daqing and Xiajia coal seams was obta

5、ined, and the conception of large and small double structure forms was proposed in the horizon of the lower coal seam roof. Based on theoretical calculation and scheme comparison analysis, the lower coal seam mining can

6、only assign stable-pressure range which was formed in the upper coal seams goaf with conditions of the 1.0m very contiguous seams combined mining, and the reasonable alternate distance range of Daqing and Xiajia coal sea

7、ms was obtained. The 1.0m very contiguous seams combined mining technology directly affected the reasonable alternate distance. Comprehensive combined mining technology of the upper mining overall height in one times and

8、 the lower caving coal was analysed. The supporting technology of roadway under the upper coal seams goaf was proposed. Through FLAC3D numerical simulation, stress field of surrounding rock and the lead abutment pressure

9、 influence on reasonable alternate distance were studied in the condition of 1.0m very contiguous seams combined mining, and it was also verified that theoretical analysis and calculation were reasonable. Lastly combinin

10、g with the field geological condition, the characteristics of strata behavior, the lead abutment pressure of each mining gateway and deformation law of surrounding rock were studied through the in site measurement. Abund

11、ant mine pressure observation data was obtained.and results of theoretical analysis and numerical simulation were verified. Mine pressure observation results indicate that implementation effect of mining technolo

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 眾賞文庫僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論