版權(quán)說(shuō)明:本文檔由用戶(hù)提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、 Procedia Engineering 161 ( 2016 ) 1037 – 1042 Available online at www.sciencedirect.com1877-7058 © 2016 The Authors. Published by Elsevier Ltd. This is an open access article under the CC BY-NC-ND license (
2、http://creativecommons.org/licenses/by-nc-nd/4.0/).Peer-review under responsibility of the organizing committee of WMCAUS 2016 doi: 10.1016/j.proeng.2016.08.845 ScienceDirectWorld Multidisciplinary Civil Engineering-Arc
3、hitecture-Urban Planning Symposium 2016, WMCAUS 2016 Improving Construction Processes Using Lean Management Methodologies – Cost Case Study Piotr Nowotarskia,*, Jerzy Pas?awskia, Jakub Matyjaa aInstitute of Structural
4、 Engineering, Pozna? University of Technology, Piotrowo 5, 60-965 Pozna?, Poland Abstract Construction sector is in general characterized by frequent deadlines delays, budget overruns and problems in maintaining proper
5、quality. To prevent such problems, a common practice is to transfer the management methods used successfully in production industry. Article presents the idea of introducing Lean Management methodologies in chosen const
6、ruction processes and the purpose of the study is to show how Lean Management can influence the total cost of selected process of managing storage area on the construction site. Article is based on the study conducted
7、by authors on the construction of office building in Poznan (Poland) city center, where proposed new approach to management was introduced and tested. Authors performed deeper analysis on introducing proposed methodolo
8、gy into 3 processes: column concreting, storage area management and scaffolding ordering. In the article authors focused their attention on economic aspects of introduced changes into one of them: storage area managemen
9、t, showing how proposed different style of management can influence costs of analyzed processes. Lean methodologies are used to assess the risk problems and find suitable solution which will influence on reduction of t
10、he total time and cost of analyzed works. Proposed idea of Lean Management in this paper as construction management solution can be remedy for many different problems in the construction industry not limited to analyz
11、ed example. © 2016 The Authors. Published by Elsevier Ltd. Peer-review under responsibility of the organizing committee of WMCAUS 2016. Keywords: Lean Management; construction process management; cost reduction;
12、 5s; construction site; Analysis of presented study led to the conclusions, that Lean Management can be interesting approach which can be implemented in construction process. Result of changing management of chosen proc
13、ess showed that visible cost and time savings are possible, depending on how deep the implementation of new approach is and what tools are * Corresponding author. Tel.: +48 61 665 2454; fax: +48 61 876-6116. E-mail add
14、ress: piotr.nowotarski@put.poznan.pl © 2016 The Authors. Published by Elsevier Ltd. This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/). Peer-review unde
15、r responsibility of the organizing committee of WMCAUS 20161039Piotr Nowotarski et al. / Procedia Engineering 161 ( 2016 ) 1037 – 1042 3. Case Study For the purposes of publication authors analyzed the realizatio
16、n of the construction of an office building “Baltic“ in Poznan (Poland). The construction began in November 2014, the planned date of completion of the work is in February 2017. The building has a very interesting shap
17、e referring to the local modernism. It will have 16 floors above ground and 3 underground. It will have over 15 000 m2 of space and the height of this building will be about 65m. Visualization of the object is presente
18、d in Fig. 2. Fig. 2. (a) Visualization of the finished structure. The view from the Zwierzyniecka street [9]; (b) and from the Franklin Roosevelt street [9]. Study is a part of bigger research on possibility if introduct
19、ion Lean Management into the construction processes. Processes that needed improvement are presented in first column in Fig. 3. Authors decided to investigate in detail in this article storage area management issue ta
20、king into account costs and savings analysis. Fig. 3. Process that needed attention with detail improvement methods and expected results. 3.1. As is state and proposed solution for storage area management. The constructi
21、on of the office building “Baltic“ has a huge problem with small square storage yard. This is due to its shape and location of the building in the city center. Analysis of the existing state using Ishikawa Diagram prove
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶(hù)所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 眾賞文庫(kù)僅提供信息存儲(chǔ)空間,僅對(duì)用戶(hù)上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶(hù)上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶(hù)因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- [雙語(yǔ)翻譯]建筑工程施工成本管理外文翻譯—運(yùn)用精益管理方法改進(jìn)施工過(guò)程-成本案例研究
- [雙語(yǔ)翻譯]建筑工程施工成本管理外文翻譯—運(yùn)用精益管理方法改進(jìn)施工過(guò)程-成本案例研究中英全
- 2016年建筑工程施工成本管理外文翻譯—運(yùn)用精益管理方法改進(jìn)施工過(guò)程-成本案例研究
- 2016年建筑工程施工成本管理外文翻譯—運(yùn)用精益管理方法改進(jìn)施工過(guò)程-成本案例研究(原文).PDF
- 2016年建筑工程施工成本管理外文翻譯—運(yùn)用精益管理方法改進(jìn)施工過(guò)程-成本案例研究.DOCX
- 建筑工程施工的成本管理方法分析與探討
- [雙語(yǔ)翻譯]建筑施工成本外文翻譯--建筑施工成本的規(guī)模收益
- 建筑工程施工的成本管理方法分析與探討芻議
- [雙語(yǔ)翻譯]建筑施工成本外文翻譯--建筑施工成本的規(guī)模收益(英文)
- 建筑工程施工成本管理淺析
- 建筑工程施工成本管理淺析
- 建筑工程施工成本管理專(zhuān)題案例講解(3)
- 建筑工程施工及成本管理
- [雙語(yǔ)翻譯]建筑施工成本外文翻譯--建筑施工成本的規(guī)模收益中英全
- 談建筑工程施工管理方法
- 建筑工程施工管理方法分析
- 建筑工程施工安全管理研究外文翻譯
- 建筑工程施工成本造價(jià)管理探析
- 論建筑工程施工階段成本管理
- 芻議建筑工程施工項(xiàng)目成本管理
評(píng)論
0/150
提交評(píng)論