版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、字?jǐn)?shù):英文 字?jǐn)?shù):英文 2253 2253 單詞, 單詞,12495 12495 字符;中文 字符;中文 3792 3792 漢字 漢字出處: 出處:Nowotarski Nowotarski P, P, Pas Pas?awski awski J, J, Matyja Matyja J. J. Improving Improving Construction Construction Processes Processes Using
2、 Using Lean Lean Management Management Methodologies Methodologies–Cost Cost Case Case Study[J]. Study[J]. Procedia Procedia engineering, engineering, 2016, 2016, 161: 161: 1037-1042. 1037-1042.外文文獻(xiàn) 外文文獻(xiàn) Improving Constr
3、uction Processes Using Lean Management Methodologies–Cost Case StudyAbstract Construction sector is in general characterized by frequent deadlines delays, budget overruns and problems in maintaining proper quality. To p
4、revent such problems, a common practice is to transfer the management methods used successfully in production industry. Article presents the idea of introducing Lean Management methodologies in chosen construction proces
5、ses and the purpose of the study is to show how Lean Management can influence the total cost of selected process of managing storage area on the construction site. Article is based on the study conducted by authors on th
6、e construction of office building in Poznan (Poland) city center, where proposed new approach to management was introduced and tested. Authors performed deeper analysis on introducing proposed methodology into 3 processe
7、s: column concreting, storage area management and scaffolding ordering. In the article authors focused their attention on economic aspects of introduced changes into one of them: storage area management, showing how prop
8、osed different style of management can influence costs of analyzed processes. Lean methodologies are used to assess the risk problems and find suitable solution which will influence on reduction of the total time and cos
9、t of analyzed works. Proposed idea of Lean Management in this paper as construction management solution can be remedy for many different problems in the construction industry not limited to analyzed example.Fig. 1. (a) W
10、aste percentages of time in manufacturing and construction ;(b) possible aspects for assessment while introducing Lean Methodologies.The goal of the article is to assess costs and possible savings while introducing Lean
11、Methodology into the management of storage area. Authors are aware of the fact that assessment of results could be performed taking into account several other aspects presented in Fig. 1b, but cost analysis was the one w
12、hich convinced management of the construction site to approve proposed ideas. Presented approach and analysis is part of bigger research conducted by authors on the construction site in Poznan on new management approach
13、in construction.2.Lean ManagementLean Management is a term which has its roots at MIT. John Krafcik used it for the first time in an article discussing the results of the international research project on the car industr
14、y dedicated to finding the causes of superiority of the Japanese automotive industry over the producing countries, the cars using traditional management methods. The key finding from this study was that the Japanese syst
15、em (Toyota Production System having its roots in the 50's) allowing to achieve similar results with the use of half of the resources (human, area of production, investment in equipment). The essence of the philosophy
16、 of lean management is to reduce waste wherever possible, and orientation to create added value for the end client, which is carried out by various methods introduced at the stage of planning and production of the produc
17、t. Below there is a brief overview of the Lean Management - 5s method, which may be successfully used in many building processes due to the low financial outlay required for its implementation. Method 5s has 5 steps from
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 眾賞文庫僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- [雙語翻譯]建筑工程施工成本管理外文翻譯—運(yùn)用精益管理方法改進(jìn)施工過程-成本案例研究(原文)
- [雙語翻譯]建筑工程施工成本管理外文翻譯—運(yùn)用精益管理方法改進(jìn)施工過程-成本案例研究中英全
- 2016年建筑工程施工成本管理外文翻譯—運(yùn)用精益管理方法改進(jìn)施工過程-成本案例研究
- 2016年建筑工程施工成本管理外文翻譯—運(yùn)用精益管理方法改進(jìn)施工過程-成本案例研究.DOCX
- 2016年建筑工程施工成本管理外文翻譯—運(yùn)用精益管理方法改進(jìn)施工過程-成本案例研究(原文).PDF
- 建筑工程施工的成本管理方法分析與探討
- [雙語翻譯]建筑施工成本外文翻譯--建筑施工成本的規(guī)模收益
- 建筑工程施工的成本管理方法分析與探討芻議
- [雙語翻譯]建筑施工成本外文翻譯--建筑施工成本的規(guī)模收益(英文)
- 建筑工程施工成本管理淺析
- 建筑工程施工成本管理淺析
- 建筑工程施工成本管理專題案例講解(3)
- 建筑工程施工及成本管理
- [雙語翻譯]建筑施工成本外文翻譯--建筑施工成本的規(guī)模收益中英全
- 談建筑工程施工管理方法
- 建筑工程施工管理方法分析
- 建筑工程施工安全管理研究外文翻譯
- 建筑工程施工成本造價(jià)管理探析
- 論建筑工程施工階段成本管理
- 芻議建筑工程施工項(xiàng)目成本管理
評(píng)論
0/150
提交評(píng)論