版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
1、 外文原文Surface settlement predictions for Istanbul Metro tunnelsexcavated by EPB-TBMS. G. Ercelebi ? H. Copur ? I. OcakAbstract In this study, short-term surface settlements are predicted for twin tunnels, which are to be
2、excavated in the chainage of 0 ? 850 to 0 ? 900 m between the Esenler and Kirazl? stations of the Istanbul Metro line, which is 4 km in length. The total length of the excavation line is 21.2 km between Esenler and Basak
3、sehir. Tunnels are excavated by employing two earth pressure balance (EPB) tunnel boring machines (TBMs) that have twin tubes of 6.5 m diameter and with 14 m distance from center to center. The TBM in the right tube fol
4、lows about 100 m behind the other tube. Segmental lining of 1.4 m length is currently employed as the final support. Settlement predictions are performed with finite element method by using Plaxis finite element program
5、. Excavation, ground support and face support steps in FEM analyses are simulated as applied in the field. Predictions are performed for a typicalgeological zone, which is considered as critical in terms of surface settl
6、ement. Geology in the study area is composed of fill, very stiff clay, dense sand, very dense sand and hard clay, respectively, starting from the surface. In addition to finite element modeling, the surface settlements a
7、re also predicted by using semi-theoretical (semi-empirical) and analytical methods. The results indicate that the FE model predicts well the short-term surface settlements for a given volume loss value. The results of
8、semi-theoretical and analytical methods are found to be in good agreement with the FE model. The results of predictions are compared and verified by field measurements. It is suggested that grouting of the excavation v
9、oid should be performed as fast as possible after excavation of a section as a precaution against surface settlements during excavation. Face pressure of the TBMs should be closely monitored and adjusted for different z
10、ones.Keywords Surface settlement prediction _ Finite element method _ Analytical method _ Semi-theoretical method _ EPB-TBM tunneling _ Istanbul MetroIntroductionIncreasing demand on infrastructures increases attention
11、to shallow soft ground tunneling methods in urbanized areas. Many surface and sub-surface structures make underground construction works very delicate due to the influence of ground deformation, which should be definit
12、ely limited/controlled to acceptable levels. Independent of theexcavations: (1) numerical analysis such as finite element method, (2) analytical method and (3) semi-theoretical (semi-empirical) method. Among them, the
13、 numerical approaches are the most reliable ones. However, the results of all methods should be used carefully by an experienced field engineer in designing the stage of an excavation project. In this study, all three pr
14、ediction methods are employed for a critical zone to predict the short-term maximum surface settlements above the twin tunnels of the chainage between 0 ? 850 and 0 ? 900 m between Esenler and Kirazl? stations of Istanbu
15、l Metro line, which is 4 km in length. Plaxis finite element modeling program is used for numerical modeling; the method suggested by Loganathan and Poulos (1998) is used for the analytical solution. A few different sem
16、i-theoretical models are also used for predictions. The results are compared and validated by field measurements.Description of the project, site and construction methodThe first construction phase of Istanbul Metro line
17、 was started in 1992 and opened to public in 2000. This line is being extended gradually, as well as new lines are being constructed in other locations. One of these metro lines is the twin line between Esenler and Basak
18、sehir, which is 21.2 km. The excavation of this section has been started in May 2006. Currently, around 1,400 m of excavation has already been completed. The region is highly populated including several story buildings,
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 眾賞文庫僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 建筑 土木工程 外文翻譯 外文文獻(xiàn) 英文文獻(xiàn) 混凝土橋梁
- 土木工程外文文獻(xiàn)翻譯
- 土木工程外文文獻(xiàn)翻譯
- 土木工程專業(yè)---外文文獻(xiàn)翻譯
- 土木工程類外文文獻(xiàn)翻譯
- 土木工程外文文獻(xiàn)翻譯2
- 土木工程類外文文獻(xiàn)翻譯1
- 土木工程類外文文獻(xiàn)翻譯 (2)
- 土木工程畢業(yè)設(shè)計(jì)外文文獻(xiàn)翻譯
- 土木工程畢業(yè)設(shè)計(jì)外文文獻(xiàn)翻譯.doc
- 土木工程外文文獻(xiàn)翻譯---鋼筋混凝土
- 土木工程類外文文獻(xiàn)翻譯---鋼筋混凝土
- 交通工程專業(yè)外文翻譯外文文獻(xiàn)英文文獻(xiàn)
- 土木工程專業(yè)畢業(yè)設(shè)計(jì)外文文獻(xiàn)翻譯2篇
- 土木工程畢業(yè)設(shè)計(jì)外文文獻(xiàn)翻譯--鋼筋混凝土
- 土木外文文獻(xiàn)及翻譯
- 模具 外文翻譯 外文文獻(xiàn) 英文文獻(xiàn) 注塑模
- 土木工程與建筑外文文獻(xiàn)翻譯--將磨碎玻璃作為混凝土細(xì)骨料的應(yīng)用(英文)
- 電氣 自動化 外文翻譯 外文文獻(xiàn) 英文文獻(xiàn)
- 建筑工程外文文獻(xiàn)翻譯
評論
0/150
提交評論