版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、<p> NATM tunnel design principle in the construction of major and Construction Technology</p><p><b> W.Broere</b></p><p> I.The NATM Design Principle</p><p> 1
2、.Tunnel design and construction of two major theoretical and development process</p><p> Since the 20th century, human space on the ground floor of the growing demand, thus the underground works of the stud
3、y of a rapid development. In a large number of underground engineering practice, it is generally recognized that the tunnel and underground cavern project, the core of the problem, all up in the excavation and retaining
4、two key processes. How excavation, it will be more conducive to the stability and cavern facilitate support : For more support, Supporting how they can more effect</p><p> Tunnels and underground caverns, a
5、nd focusing on the core issues with the above practice and research, in different periods, People of different theories and gradually established a system of different theories, Each system includes theory and resolve (o
6、r are studying the resolution) from the works of understanding (concept), mechanics, engineering measures to the construction methods (Technology), a series of engineering problems. </p><p> A theory of the
7、 20th century the 1920s the traditional "load relaxation theory." Its core content is : a stable rock self-stability, no load : unstable rock may have collapsed. need shoring structure to be supported. Thus, th
8、e role of the supporting structure of the rock load is within a certain range may be due to relaxation and collapse of rock gravity. This is a traditional theory, and their representative is Taishaji and Principe's a
9、nd others. It works similar to the surface issues of the th</p><p> Another theory of the 20th century made the 1950s the modern theory of timbering or "rock for the theory." Its core content is :
10、 rock stability is clearly bearing rock to their own self-stability : unstable rock loss of stability is a process, and if this process in providing the necessary help or restrictions will still be able to enter the rock
11、 steady state. This theoretical system of representative characters Labuxiweici, Miller-Feiqieer, Fenner - Daluobo and Kashitenai others. This is a more</p><p> Can be seen from the above, the former theory
12、 more attention to the findings and the results of treatment : The latter theory is even more attention to the process and the control of the process, right from the rock for the full utilization of capacity. Given this
13、distinction, which both theory and methods in the process, each with different performance characteristics. NATM theory is rock for the tunnel engineering practice in the representation method.</p><p><b&
14、gt; 2. NATM </b></p><p> NATM that the new Austrian Tunneling Method short the original is in New Austrian Tunneling Method, referred to as the NATM. France said it convergence bound or some countrie
15、s alleged to observe the dynamic design and construction of the basic principles. </p><p> NATM concept of filibustering Xiweici Austria scholars in the 20th century, Professor age of 50. It was based on th
16、e experience of both the tunnel and rock mechanics theory, will bolt and shotcrete combination as a major means of supporting a construction method, Austria, Sweden, Italy and other countries, many practical and theoreti
17、cal study in the 1960s and patented officially named. Following this approach in Western Europe, Scandinavia, the United States and Japan and many other underground </p><p> (1). Rock tunnel structure is th
18、e main loading unit, the construction must fully protect the rock, it minimize the disturbance to avoid excessive damage to the intensity of rock. To this end, the construction of sub-section should not block too much, e
19、xcavation should be used smooth blasting, presplit blasting or mechanical tunneling.</p><p> ?。?). In order to give full play to rock the carrying capacity should be allowed to control and rock deformation.
20、While allowing deformation, which can be a rock bearing ring; The other hand, have to limit it, Rock is not so lax and excessive loss or greatly reduced carrying capacity. During construction should be used with rock clo
21、se to, the timely building puzzle keeps strengthening Flexible support structure, such as bolting and shotcreting supporting. This adjustment will be adopted supportin</p><p> ?。?). In order to improve the s
22、upport structure, the mechanical properties, the construction should be closed as soon as possible, and to become a closed cylindrical structure. In addition, the tunnel shape with a round should, as far as possible, to
23、avoid the corner of the stress concentration. </p><p> ?。?). Construction right through the rock and supporting the dynamic observation, measurement, and reasonable arrangements for the construction procedur
24、es, changes in the design and construction management of the day-to-day. </p><p> (5). To lay waterproof layer, or is subject to bolt corrosion, deterioration of rock properties, rheological, swelling cause
25、d by the follow-up to load, use composite lining. </p><p> ?。?). Lining in principle, and the early rock deformation Supporting the basic stability of the conditions under construction. rock and supporting s
26、tructure into a whole, thereby improving the support system of security. </p><p> NATM above the basic elements can be briefly summarized as : "less disturbance, early spray anchor, ground measurements
27、, closed tight."</p><p> 3.With a spring to understand the principle NATM </p><p> (1). Cavern brink of a point A in the original excavation ago with stress (stress self-respect and tecto
28、nic stress) in a state of equilibrium. As an elastic stiffness of the spring K, P0 under compression in a state of equilibrium.</p><p> ?。?). Cavern excavation, A point in attacking lose face constraints, th
29、e original stress state to be adjusted, if the intensity of rock big enough, After less stress adjustments may cavern in a stable condition (without support). But most of the geological conditions of the poor, that is, a
30、fter the stress cavern adjustments, such as weak protection, we could have convergence deformation, even instability (landslides), must be provided to support power PE, in order to prevent landslides instabilit</p>
31、<p> ?。?). By the mechanical balance equation, we can see in the spring P0 role in a state of equilibrium; Spring in the event of deformation u, PE in the role they will be in equilibrium, assuming spring elastici
32、ty of K, were : P0=PE+Ku </p><p> Discussion : </p><p> (1) When u = 0, that is not allowed P0=PE rock deformation, is a rigid support, not economic; </p><p> (2) when u ↑, PE ↓;
33、 When u ↓, PE ↑. That is, rock deformation occurred, the release of some of the load (unloading), we should allow some extent rock deformation, to give full play to rock the capacity for self. Is an economic support meas
34、ures, the rock self-stability P=P0-PE=Ku;</p><p> (3) When u=umax, landslides, have relaxation load and unsafe. </p><p><b> 4. Points</b></p><p> ?。?). Rock cavern exc
35、avation is affected by that part of rock (soil) body, the rock is a trinity : have a load bearing structure, building materials. </p><p> ?。?). Tunnel construction is in the rock stress is of special archite
36、ctural environment, which can not be equated with the construction on the ground. </p><p> ?。?). Tunnel structure rock + = bracing system.</p><p> II. The new Austrian highway construction in t
37、he basic method</p><p> NATM one of the characteristics is the scene monitoring, measurement information to guide construction, through the tunnel construction measure receipts and excavation of the geologi
38、cal observation for prediction and feedback. And in accordance with the established benchmark for measuring the tunnel construction, excavation section steps and sequences, Supporting the initial parameters for reasonabl
39、e adjustments to guarantee the safety of construction, a tunnel rock stability, the quality of the</p><p> 1. A tunnel construction method of choice tunnel construction method of choice, mainly based on the
40、 engineering geological and hydrogeological conditions Construction, rock type, buried deep tunnel, the tunnel section size and length lining types, Construction should be the premise of safety and engineering quality at
41、 the core, and with the use of the tunnel function, the level of construction technology, Construction machinery and equipment, time requirements and economic feasibility of factors</p><p> When choosing th
42、e method for tunnel construction on the surrounding environment negatively affected, should also be a tunnel, the environmental conditions as the method to choose one of the factors, taking into rock changes the method a
43、nd the applicability of the possibility of change. Tunnel project to avoid mistakes and unnecessary increase investment in public works. NATM new construction, we should also consider the entire process of construction o
44、f auxiliary operations and changes in the su</p><p> 2. New Austrian Tunneling Method program New Austrian Tunneling Method used all methods can be divided into sections, Division level and the three major
45、types of excavation method and some changes in the program.</p><p> (1) Full-face method. That whole section excavation method is based on the design of an excavation face excavation molding. Excavation ord
46、er is its full face excavation, steel bracing, pouring concrete lining. Often choose to IV-VI Class Rock Hard Rock Tunnel, which can be used blasting deep hole.</p><p> Excavation whole section of the law i
47、s a larger space operations, introducing supporting large mechanized operations, improving the speed and process small, less interference and facilitate the construction organization and management. Excavation is due to
48、shortcomings in the larger, lower relative stability of rock, and with each cycle of the relatively large workload, it requires the construction units should have a strong excavation, transport and slag out and support c
49、apability, Maojingba VI</p><p> Full-face excavation face, drilling and blasting construction more efficient use of deep focus to accelerate the excavation blasting speed, and the rock blasting vibration fr
50、equency less conducive to a stable transfer rocks. The drawback is every deep hole blasting vibration larger. Therefore require careful drilling and blasting design and strict control of blasting operations. </p>
51、<p> Full-face excavation method is the main process : the use of mobile carts (or platforms), the first full-face a bored, and installed a line, and then drilling platform car outside 50m back to a safe place and
52、then detonate, Blasting to make a shape out after drilling Jardine car again moved to the excavation face in place, began a cycle of drilling and blasting operations, Anchor sprayed simultaneously supporting or after the
53、 first arch wall lining.</p><p> (2) step method. Step method of design is generally divided into sections on the half-section and the lower half section two excavation molding. Excavation order is its firs
54、t half excavation arch bolt jet concrete bracing, arch lining, the central part of the second half of excavation, sidewall of excavation, concrete wall jet bolt support and lining. The more applicable to the II, III and
55、soft joint development of the surrounding rock, which were used Tim change program.</p><p> Long-step method : The next stage distance away, on the general level above 50m ahead, Construction can be assigne
56、d to the Department of next larger machine with parallel operations, when mechanical deficiencies can be used interchangeably. When the case of a short tunnel, the upper section will be all dug later, and then dug under
57、the section, the construction of which less interference, single process can work.</p><p> Short step method : on the stage length 5-50m apply to Ⅱ, Ⅲ rock can be shortened Invert closing time, Supporting i
58、mprove early stress conditions, but larger construction interference, in the event of Soft Rock need to consider carefully, Auxiliary shall be applied measures to stabilize the excavation excavation face, in order to ens
59、ure the safety of construction. </p><p> Ultrashort step method : The only step ahead 3-5m, section closed faster. The method used for the high level of mechanization of various rock section, in the event o
60、f the siege soft rock when required careful consideration. Auxiliary shall be applied measures to stabilize the construction excavation face to ensure the safety of construction. </p><p> Excavation level o
61、f character is the first step to using light excavation drilling machine drill a hole, rather than through large drilling platform car. Two step method of excavation operations with sufficient space and a faster rate of
62、construction. Level is conducive to the stability of excavation face. Especially Excavation in the upper, lower operational safety. Three step method of excavation is the next shortcomings of operations interfere with ea
63、ch other. It should be noted at the bottom</p><p> (3) Segment excavation method. Excavation Law Division can be divided into five changes in the program : Excavation Division level, from top to bottom hole
64、 lead, heading advance on the excavation, single (double) and lateral pit method. Excavation will be conducted Section Division excavation by the Ministry of shape, and to advance some of excavation, it may be called der
65、ivative ahead excavation pit method. </p><p> Law Division level : general application or soil collapse easily lots of soft rock, with its advantages - stage method, height can be lengthened, the two-lane t
66、unnel for a hole-fold, cycling Road Tunnel - hole 2 times; rather than single (double) PENDANTS Heading a high degree of mechanization, can accelerate the progress of the projects.</p><p> The next heading
67、advance excavation method (that is guided pit wall first arch) : This Act applies to Ⅱ, Ⅲ rock. in the soft ground tunneling, to be adopted next general guide advance excavation pit wall first arch Act. Its advantages ar
68、e : Heading advance excavation, the use of proven geological conditions in advance to facilitate change in the method. Face to facilitate started procedures applicable to the labor arrangements for the use of small machi
69、nery and construction. The drawbacks : The </p><p> Unilateral-arm pit Law : rock instability, the tunnel span larger, ground subsidence is difficult to control when using this method. Its characteristics a
70、re : a positive step and arms Heading Act advantages. </p><p> Bilateral arm Heading law : in large-span shallow tunnels, surface subsidence require strict, especially poor rock used. Advantages of this met
71、hod are : Construction of safe, reliable, but slow construction, high cost. </p><p> III.The main tunnel construction technology</p><p> 1. Cave construction</p><p> ?。?) excavati
72、on slope around </p><p> Lofting total station measurements, the use of excavators from top to bottom, paragraph by paragraph excavation, not the amount of excavation or the end of next overlapping excavati
73、on, remove pits with the above may slump topsoil, shrubs and rock slopes, rock strata of slope excavation needs blasting, Discussion should focus mainly loose blasting. Also partial artificial finishing, when excavation
74、and inspection slope of slope, if sliding and cracking phenomenon and slowing down due slope. </p><p> (2).Cheng Tung-supporting </p><p> Yang Brush Singapore Singapore after the completion of
75、 timely inspection plate slope gradient, the gradient to pass the inspection, the system set up to fight time anchor, and the exposed bolt heads, hanging metal based network expansion and bolt welding into first overall.
76、 Linked network immediately after the completion of shotcrete and repeatedly jet until it reaches the thickness of the design so far. </p><p> ?。?).as of gutter construction </p><p> Yang slop
77、e away from the groove 5 meters excavation ditch interception, interception gutter mainly mechanical excavation, artificial finishing, after dressing, 7.5# immediately masonry made of mortar and stones, and the floor sur
78、face with mortar. </p><p> 2. Auxiliary construction </p><p> ?。?)A long pipe roof </p><p> Sets arch construction : construction Lofting, template installation, assembling reinfo
79、rcement, the guidance of lofting 127 installation guide, concrete pouring. </p><p> Pipe specifications : Heat Nazarbayev Seamless Steel Tube ¢ 108 mm and a thickness of 6 mm, length of 3 m, 6 m;</p>
80、<p> N pipe from : Central to the distance 50 cm;</p><p> N Inclination : Elevation 1 ° (the actual construction works by 2 °), the direction parallel with the Central Line; </p><
81、;p> N pipe construction error : Radial not more than 20 cm; </p><p> N tunnel longitudinal joints within the same section with more than 50% adjacent pipe joints staggered at least a meter. </p>
82、<p> A. pipe roof construction method </p><p> Lofting accurate measurement personnel, marking the centerline and the vault out of its hole elevation, soil excavation reserved as a core pipe roof cons
83、truction work platform Excavation footage of 2.5 meters, after the end of excavation, artificial symmetrical on both sides of excavation (Commodities H) platform, level width of 1.5 meters, 2.0 meters high, as constructi
84、on sets and pipe arch shed facilities drilling platform. Pipe-roof design position should be and it should be a good hole steel</p><p> B. pipe roof construction machinery </p><p> N drilling
85、machinery : XY-28-300 equipped with electric drill, drilling and pipe jacking long shelf; </p><p> N grouting machine : BW-250/50-injection pump two Taiwan;</p><p> N using cement-water glass
86、slurry. Mud and water volume ratio 1:0.5; water glass slurry concentration of water-cement ratio 1:1 silicate 35 Baume; The efficacy silicate modulus pressure grouting pressure early pressure 2.0MPA 0.5~1.0MPA; end. <
87、/p><p> (2). a small catheter </p><p> A. small catheter used ahead diameter of 42 mm and a thickness of 3.5 mm thermal Nazarbayev seamless steel tubes, steel pipe was front-tip, Welding on the t
88、ail ¢ 6 stiffening brace and the wall around the drilling hole grouting 8 mm, but the tail of a meter without grouting holes and Advance Construction of a small catheter, the tubes and the lining of the centerline parall
89、el to 10 ° -30 ° Chalu into the rock arch. penstocks to 20-50 cm spacing. Each was over a steel tubes, should be closed imme</p><p> B. Grouting parameters </p><p> N water slurry an
90、d water glass volume : 1:0.5; </p><p> N slurry water-cement ratio 1:1 </p><p> N 35 Baume concentration of sodium silicate; The efficacy silicate modulus </p><p> N grouting pre
91、ssure 0.5~1.0MPA; if necessary, set up only orifice Pulp Cypriots. </p><p> ?。?). bolting ahead : The Chalu must be greater than 14 degrees, grouting satiated and lap length is not less than 1 meter. </p&
92、gt;<p> 3.Correcting construction </p><p> Embedded parts used by the Design Dimensions plank make shape design, installation in contrast snoop plate car, and position accuracy (error ± 50CM),
93、the firm shall not be fixed, you must be in possession of the wire through the middle wear. </p><p> 4. Leveling Construction </p><p> Installation templates, at the request of both sides leve
94、ling layer calibration position to install template. Side-channel steel templates used [10#, top elevation with a corresponding length of the road elevation unanimously to allow deviation ± 2mm. adjusted using the s
95、tandard measurement to determine elevation. Every template fixed a certain distance from the outside to ensure that no displacement, the joints template close comfort, not from a slit, crooked and formation, and the bott
96、om conne</p><p> 5. Water, cable duct construction </p><p> Install groove wall reinforcement of location accuracy, the line must be linked to the construction. Install groove wall purity, the
97、 purity requirements of accurate location, a vertical line. Dyadic greatest degree of not more than 3 mm, and template-Ditch The top-pronged, pass the inspection before the concrete reperfusion, on the side of the origin
98、al wall must pick hair, and embedded parts to the location accurately. Template using stereotypes purity. </p><p> 6.Gate Construction </p><p> Cleared the site for construction layout. By des
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 眾賞文庫(kù)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 土木外文文獻(xiàn)及翻譯
- 土木外文文獻(xiàn)及翻譯3
- 有關(guān)隧道方面外文文獻(xiàn)與翻譯.doc
- 隧道施工外文文獻(xiàn)及翻譯
- 新奧法與隧道施工
- 土木工程外文文獻(xiàn)翻譯
- 土木工程外文文獻(xiàn)翻譯
- 土木工程畢業(yè)設(shè)計(jì)外文文獻(xiàn)翻譯
- 建筑 土木工程 外文翻譯 外文文獻(xiàn) 英文文獻(xiàn) 混凝土橋梁
- 土木工程專業(yè)---外文文獻(xiàn)翻譯
- 外文文獻(xiàn)翻譯-- 鐵路隧道的安全
- 外文文獻(xiàn)翻譯-- 鐵路隧道的安全
- 外文文獻(xiàn)翻譯-- 鐵路隧道的安全
- 土木工程外文文獻(xiàn)翻譯2
- 土木工程類外文文獻(xiàn)翻譯
- 土木工程畢業(yè)設(shè)計(jì)外文文獻(xiàn)翻譯.doc
- 土木工程建筑外文翻譯外文文獻(xiàn)英文文獻(xiàn)地鐵地表沉降
- 外文文獻(xiàn)翻譯-- 鐵路隧道的安全.doc
- 外文文獻(xiàn)翻譯-- 鐵路隧道的安全.doc
- 土木工程類外文文獻(xiàn)翻譯1
評(píng)論
0/150
提交評(píng)論