版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、Design and Practice of an Elevator Control System Based on PLC Xiaoling Yang1, 2, Qunxiong Zhu1, Hong Xu1 1 College of Information Science and greatly affects the elevator’s running quality. Therefore, entrusted by an
2、enterprise, we have improved electrical control system of a relay-controlled elevator in a residential building by using PLC. The result showed that the reformed system is reliable in operation and easy for maintenan
3、ce. This paper introduces the basic structure, control principle and realization method of the elevator PLC control system in detail. 2. System structure The purpose of the elevator control system is to manage movement
4、of an elevator in response to user’s requests. It is mainly composed of 2 parts: 2.1. Electric power driving system The electric power driving system includes: the elevator car, the traction motor, door motor, brake me
5、chanism and relevant switch circuits. Here we adopted a new type of LC series AC contactors to replace the old ones, and used PLC’s contacts to substitute the plenty of intermediate relays. The circuits of traction m
6、otor are reserved. Thus the original control cabinet’s disadvantages, such as big volume and high noise are overcome efficiently. 2.2. Signal control system The elevator’s control signals are mostly realized by PLC. Th
7、e input signals are: operation modes, operation control signals, car-calls, hall-calls, safety/protect signals, door open/close signal and leveling signal, etc. All control functions of the elevator system are realize
8、d by PLC program, such as registration, display and elimination of hall-calls or car-calls, position judgment of elevator car, choose layer and direction selection of the elevator, etc. The PLC signal control system
9、diagram of elevator is showed in Figure 1. Figure 1 PLC signal control system diagram 2.3. Requirements The goal of the development of the control system is to control 2 elevators in a 9-storey residential building. For
10、 each elevator, there is a sensor located at every floor. We can use these sensors to locate the current 2008 Workshop on Power Electronics and Intelligent Transportation System978-0-7695-3342-1/08 $25.00 © 2008 IEE
11、E DOI 10.1109/PEITS.2008.44 94The whole program is mainly composed of 10 modules: hall-call registration and display module, car-call registration and display module, the signal combination module, the hall-call cancel
12、 module, the elevator-location display module, the floor selection module, the moving direction control module, the door open/close module, the maintenance operation module and the dispatching module under parallel r
13、unning mode. The design of the typical modules is described as follows: 3.1. Hall-call registration and display There are two kinds of calls in an elevator: hall-call and car-call. When someone presses a button on the f
14、loor control panel, the signal will be registered and the corresponding lamp will illuminate. This is called hall-call registration. When a passenger presses a button in the elevator car, the signal will be registered
15、 and with the corresponding lamp illuminated. This is called car-call registration. Figure2 shows the ladder diagram of up hall-calls registration and display. The self-lock principle is used to guarantee the calls’ co
16、ntinuous display. Figure 2 up hall-call registration and display 3.2. The collective selection of the calls Here the collective selection control rules are used. As showed in Figure3, M5.1-M5.7, M6.0 and M6.1 are auxili
17、ary relays in PLC. They denote the stopping request signal of 1st to 9th floor respectively. The auxiliary relay M6.2 denotes the elevator driver’s operation signal. When there is a call in a certain floor, the stoppi
18、ng signal of corresponding floor will output. When the elevator is operated by the driver, the hall-calls will not be served. And the elevator cannot pass a floor at which a passenger wishes to alight. 3.3. The cance
19、llation of the calls The program of this module can make the elevator response the hall-calls which have the same direction as the car’s current direction, and when a hall-call is served, its registration will be cance
20、led. The ladder diagram of up hall-calls’ cancellation is showed in Figure4. Figure 3 The combination of the calls Figure 4 The cancellation of up calls In Figure4, the auxiliary relay M4.0 is the up moving flag of the
21、elevator. When the current direction of the elevator is up, M4.0’s contacts are closed; on the contrary, when the current direction of the elevator is down, M4.0’s contacts are opened. M0.1 to M0.7 denotes the car-cal
22、ls’ stopping request signal of floor 2 to floor 8 respectively. This program has two functions: (1) Make the elevator response the normal down hall-calls when it is moving down, and when a down hall-call is served, it
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 眾賞文庫(kù)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 外文翻譯---基于plc電梯控制系統(tǒng)的設(shè)計(jì)與實(shí)踐
- 外文翻譯---基于plc電梯控制系統(tǒng)的設(shè)計(jì)與實(shí)踐
- 外文翻譯---基于plc電梯控制系統(tǒng)的設(shè)計(jì)與實(shí)踐
- 外文翻譯---基于plc電梯控制系統(tǒng)的設(shè)計(jì)與實(shí)踐
- 外文翻譯---基于PLC電梯控制系統(tǒng)的設(shè)計(jì)與實(shí)踐.docx
- 外文翻譯---基于PLC電梯控制系統(tǒng)的設(shè)計(jì)與實(shí)踐.docx
- 外文翻譯-- 基于plc的電梯控制系統(tǒng)的設(shè)計(jì)與應(yīng)用
- 電梯畢業(yè)設(shè)計(jì)--基于plc電梯控制系統(tǒng)設(shè)計(jì)(含外文翻譯)
- 基于plc電梯控制系統(tǒng)設(shè)計(jì)
- 基于plc電梯控制系統(tǒng)設(shè)計(jì)
- 基于plc的電梯控制系統(tǒng)設(shè)計(jì)
- 基于plc的電梯控制系統(tǒng)設(shè)計(jì)
- 基于plc的電梯控制系統(tǒng)設(shè)計(jì)
- 基于plc的電梯控制系統(tǒng)設(shè)計(jì)
- 基于plc的電梯控制系統(tǒng)的設(shè)計(jì)與應(yīng)用畢業(yè)論文外文翻譯
- 基于plc電梯控制系統(tǒng)設(shè)計(jì)
- 基于plc的電梯控制系統(tǒng)設(shè)計(jì)
- 基于plc電梯控制系統(tǒng)的設(shè)計(jì)
- plc電梯畢業(yè)設(shè)計(jì)--基于plc的電梯聯(lián)鎖控制系統(tǒng)
- 基于plc電梯控制系統(tǒng)設(shè)計(jì)本
評(píng)論
0/150
提交評(píng)論