2023年全國碩士研究生考試考研英語一試題真題(含答案詳解+作文范文)_第1頁
已閱讀1頁,還剩52頁未讀, 繼續(xù)免費閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)

文檔簡介

1、Along with the rapid development of the market competition environment, more and more companies are paying attention to the solution of the production line balancing problem. On the basis of this, new and high technology

2、 develops rapidly, enterprise production mode changes. The enterprise that has high automation equipment makes the production process of working hours stable gradually, it is more accurate for enterprise to formulate pro

3、duction enterprise system and implement standardized management.
  In addition, making full use of high efficiency, high production equipment can make the whole assembly line production efficiency improved, and how to

4、 shorten the production cycle time and making the whole production line synchronous is very serious for enterprise. Production line balancing rate is the quantitative index of production , it is used to evaluate the disc

5、retion of assembly line balance.
  Combining with the enterprise production status, I find that the problem mainly comes from the production line balance. According to the study, industrial engineering technology is o

6、ne of the most effective ways to solve the product line balance problem and plays a large role in analysis and improvement of the balance. First, I introduce the theory of the production line balancing, the important fac

7、tors of influencing production line balancing. Second, I analyze the basic means and methods of the Industrial Engineering and the theory about learning curve, x-σ control chart. Third, according to the basic theory of I

8、ndustrial Engineering, I defined the way to improve the production line balancing. The end, I reveal the relationship of a balanced production, the quality and production efficiency and points out that the production lin

9、e balancing is the one of the important methods for enterprise to design production procedure and standard operation. The solutions to the problem are:
  1、apply theory about learning curve and combine with the actual

10、 production condition (off-season/season), improve the cycle time in time (such as: working hour of new employees and skilled workers is different).
  2、 use x-σ control chart, measure the cycle time again.
  3、 co

11、mbine with program analysis, adjust work content and distribution about D type bread.
  4、apply the method of man-machine operation. Analyze the ratio to man and equipment and reason, then increase the equipment or fi

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 眾賞文庫僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論